by Hundred Dollar Labs

All utilities › Dataset

PURPA avoided-cost rates dataset (pilot): CSV/JSON, $49

The facts on this site in one machine-readable file: 59 investor-owned utilities in 21 states, 12 fields each, with source links and verbatim quotes. A pilot licence at a pilot price, with 12 months of updates.

Exactly what you get

It is not a national dataset, it does not include full rate matrices, and it is not advice. Rates, eligibility and contract terms change: confirm them with the utility or the state utility commission before relying on them.

Free sample: Idaho Power, Idaho and Duke Energy Carolinas, North Carolina

The main table's columns for two utilities. Every value is also free to read, utility by utility, on this site.

Fields

Columns in avoided-cost-rates.csv. Each field also has _note, _sources, _checked_on and _unverified columns.

ColumnFieldWhat it holds
scheduleScheduleThe tariff schedule, rate sheet or standard contract that holds the standard-offer rates.
docket_or_orderDocket or orderThe commission docket and order (or approval letter) the current rates come from.
effective_dateEffective dateWhen the current rates took effect, as printed (a date, or a short statement where there is no single date).
next_updateNext updateWhen the rates are due to change next, or the rule that sets the update cycle.
eligibility_capSize capWhich qualifying facilities can use the standard rates: size caps and other limits.
resource_typesResource typesWhich technologies are eligible, and whether rates differ by technology.
energy_rate_structureEnergy rate structureHow energy is priced: fixed or levelized prices, forecasts, market-indexed or as-available, time periods.
energy_ratesEnergy rates (sample cells)A few clearly labelled cells copied as printed, with units and vintage in the label. Not the full rate matrix. The cells are in energy-rates.csv; the main table has only this field's _note, _sources, _checked_on and _unverified columns.
capacity_paymentCapacity paymentWhether and how capacity is paid, as printed.
contract_termsContract termsThe contract lengths available.
price_fixityPrice fixityHow long prices stay fixed, and what floats.
schedule_urlSchedule linkThe link to the schedule or rate document itself.

Files in the download

Licence, in plain language

$49, one time: the October 4, 2026 snapshot

Three CSV files, one JSON file, a README and the licence, in one zip, with 12 months of updates.

Buy on the data store — $49

Checkout is on the Hundred Dollar Labs data store. One-time payment through Stripe, which handles receipts, tax and refunds. You download the zip right after paying. By buying you accept the licence above.