The standard-offer rates that 59 investor-owned utilities in 21 states publish for small generators (qualifying facilities) under PURPA, field by field, each with a link to the tariff or commission order it comes from. Checked on October 4, 2026.
Under PURPA, an electric utility must buy the energy and capacity that a qualifying facility (QF), such as a small solar, wind, hydro or cogeneration plant, offers to it (18 CFR 292.303(a)). The price is the utility's avoided cost: "the incremental costs to an electric utility of electric energy or capacity or both which, but for the purchase from the qualifying facility or qualifying facilities, such utility would generate itself or purchase from another source" (18 CFR 292.101(b)(6)).
FERC's rules say standard rates "shall" be put into effect for QFs with a design capacity of 100 kilowatts or less, and "may" be for larger ones (18 CFR 292.304(c)). A QF can sell energy as it becomes available, at the avoided cost at the time of delivery, or under a contract priced at the time of delivery or at the time the obligation is incurred (18 CFR 292.304(d)). The pages here show what each utility's state commission has approved: the schedule, size cap, rate structure, sample rates as printed, and when they change next.
| Utility | Schedule | Size cap | Rate structure | Effective | Checked on |
|---|---|---|---|---|---|
| Arizona | |||||
| Arizona Public Service (APS) | Rate Rider EPR-2, Partial Requirements Service for Qualified Facilities of 100 kW or Less (A.C.C. No. 6214, Revision No. 21); purchase terms in Service Schedule 2 (Terms and Conditions for Energy Purchases from Qualified Cogeneration and Small Power Production Facilities) | Customers with an on-site QF of 100 kW-ac nameplate or less interconnected to APS's distribution grid; QFs larger than 100 kW contract under Decision Nos. 52345 and 77512. | Bill credit for exported energy in $ per kWh, by season (summer = May-October billing cycles, winter = November-April) and by on-peak/off-peak hours of the customer's retail rate (shoulder-peak hours credited at the on-peak rate); separate Non-Firm and Firm rates. | 2024-03-08 | 2026-10-04 |
| Tucson Electric Power (TEP) | Rider-11 (R-11), Partial Requirements Service (PRS) and Purchase Rates for Qualifying Facilities (Third Revised Sheet No. 711) | Published purchase rates apply to QF Customers (generator and load at the same premises) with nameplate capacity 100 kW or less; QFs over 100 kW get individually negotiated contracts under Decision No. 77513. Not available to customers on Net Metering Rider-4. | Short-run avoided cost energy rates in cents per kWh, by season (summer = May-September billing cycles, winter = October-April) and by interconnection voltage (distribution vs. high voltage). Renewable QFs: flat seasonal rate by solar technology profile. Cogeneration QFs: on-peak/off-peak (summer on-peak 2-8 p.m. weekdays; winter on-peak 6-10 a.m. and 5-9 p.m. weekdays). A minimum $25.00 monthly basic service charge applies to QF Customers selling energy. | 2026-06-01 | 2026-10-04 |
| UNS Electric | Qualified Facilities tariffs QF-A (Full Requirements 100 kW or Less, Sheet 804), QF-B (Partial Requirements 100 kW or Less, Sheet 805) and QF-C (Optional Service Over 100 kW, Sheet 806); Fourth Revised Sheets | QF-A and QF-B: QF Customers requiring 100 kW or less (QF-A buy/sell full requirements; QF-B partial requirements; both must take a standard offer rate with a demand charge). Renewable rate tables are stated for QFs with nameplate capacity below 100 kW. QFs over 100 kW contract under Decision No. 77514 (QF-C). | Short-run avoided cost energy rates in cents per kWh, by season (summer = May-October billing cycles, winter = November-April) and by interconnection voltage (distribution vs. high voltage). Renewable QFs: flat seasonal rate by solar technology profile. Cogeneration QFs: on-peak/off-peak (summer on-peak 2-8 p.m. weekdays; winter on-peak 5-9 a.m. and 5-9 p.m. weekdays). QF-A nets monthly kWh and pays the purchase rate only on net deliveries. | 2026-06-01 | 2026-10-04 |
| Colorado | |||||
| Black Hills Energy (Colorado) | Rate CG-SPP1 Co-Generation and Small Power Production (rate code CO700, Sheets 48-49) with Rules and Regulations Section 20 - Co-Generation and Small Power Production Facilities (Sheets R33-R36, Purchased Power Amount Table on Seventh Revised Sheet No. R36), Colo. PUC No. 11 | CG-SPP1 standard rate: QFs with generating capabilities of 100 kW or less (Categories 1 and 2: 10 kW and under; over 10 kW through 100 kW). Categories 3-5 (over 100 kW up to 10 MW) contract at avoided capacity and energy costs; contracts above 100 kW are filed with the Commission. | Single flat energy payment per kWh (Average Hourly Incremental Cost of Electricity) for Categories 1 and 2; no capacity payment. Billing nets credits for energy delivered against retail charges for energy used; credit balances carry forward (direct payment on request). | 2026-01-01 | 2026-10-04 |
| Xcel Energy (Colorado) | Small Power Production and Cogeneration Facility Policy (Electric Purchase), Colo. PUC No. 8 Electric Sheets P1-P7; Purchase Payment Amount Table on Ninth Revised Sheet No. P7 | QFs with a design capacity of 100 kW or less; QFs above 100 kW must be successful bidders in the Company's Resource Planning process. Customers on Net Metering Schedule NM or Photovoltaic Schedule PV are not eligible. | Flat $/MWh payment for all MWh delivered, by technology: an Energy Payment Rate Component (reset each January 1) plus a Capacity Payment Rate Component (fixed at the rate for the year the QF reached commercial operation). No time-of-day or seasonal differentiation. Company takes the RECs unless otherwise agreed. | 2026-01-01 | 2026-10-04 |
| Georgia | |||||
| Georgia Power | QF Standard Offer Contracts approved by the GPSC: Energy-Only PPA ('Standard Contract for the Purchase of Non-Firm Energy from a Qualifying Facility', available to any eligible QF); Capacity and Energy PPA and Proxy PPA (only when Georgia Power has an IRP capacity need and has issued a capacity RFP). Small customer-sited generation sells excess energy under tariff Schedule RNR-11 (Renewable and Nonrenewable Resources). | Energy-Only PPA: any eligible QF (small power production QFs are 80 MW or less under FERC rules). Capacity payment: a QF over 30 MW must bid into a capacity RFP; a QF of 30 MW or less is exempt from bidding but must give notice of intent through the RFP. RNR-11: renewable resources up to 10 kW AC (residential) or 250 kW AC (commercial), with 100-250 kW AC systems limited to 125% of the prior year's peak demand; fuel cells up to 10 kW AC (residential) or 100 kW AC (commercial). | As-available, variable hourly pricing. Energy-Only PPA monthly payment = the sum over each hour of energy delivered (grossed up for RCB Framework loss benefits, roughly 0-7% depending on interconnection level) times the Hourly Avoided Energy Rate ($/MWh) for that hour. The annual filing gives informational 20-year projections: for non-intermittent QFs by year and by season/period (peak season June-September; peak hours are weekday 9am-10pm EDT); for intermittent QFs by year and technology (profile-weighted). The QF also pays a Monthly Administrative Charge of $115 (<3 MW) or $275 (>=3 MW). RNR-11 Instantaneous Netting credits excess energy at the annual Solar Avoided Energy Cost rate plus a 4 cents/kWh Renewable Generation Adder. | No single effective date: energy is paid at the hourly avoided cost under the pro forma contracts approved by the 2021-03-11 Final Order; the current avoided-cost projections were filed 2026-06-26 | 2026-10-04 |
| Idaho | |||||
| Avista | Schedule 62, Cogeneration and Small Power Production Schedule - Idaho (I.P.U.C. No. 28), paying IPUC-published SAR-based avoided cost rates for QFs at or below the Eligibility Cap | Wind and solar: 100 kW nameplate; all other QFs: 10 average MW in any given month. Larger QFs get IRP-based negotiated rates. | By resource type, project online year and contract length; levelized or non-levelized. Heavy/Light Load Hour differential of $5/MWh (Daily Shape Adjustment); seasonal factors 108% (Jul-Feb) and 84% (Mar-Jun). Wind tables also show price less wind integration adjustment. Rates are published by IPUC per online year (2026-2031) and contract length (1-20 years), levelized and non-levelized; the 'Rate Effective Date' line in the published PDFs is left as the placeholder 'XXXX XX, 2026'. | 2026-08-03 | 2026-10-04 |
| Idaho Power | Schedule 73, Cogeneration and Small Power Production Schedule - Idaho (I.P.U.C. No. 30, Tariff No. 101), paying IPUC-published SAR-based avoided cost rates for QFs at or below the Eligibility Cap | Wind and solar: 100 kW nameplate; all other QFs: 10 average MW in any given month; energy storage: 100 kW or smaller. Larger QFs get IRP-based negotiated rates. | By resource type, project online year and contract length; levelized or non-levelized. Heavy/Light Load Hour differential of $7.28/MWh (Daily Shape Adjustment); seasonal factors 73.5% (Mar-May), 120% (Jul, Aug, Nov, Dec), 100% (other months). Wind/solar subject to Schedule 87 integration charges (shown 'NA' in current tables). Rates are published by IPUC per online year (2026-2031) and contract length (1-20 years), levelized and non-levelized; the 'Rate Effective Date' line in the published PDFs is left as the placeholder 'XXXX XX, 2026'. | 2026-07-28 | 2026-10-04 |
| Rocky Mountain Power | No standard-offer rate schedule found in RMP's Idaho tariff; standard offer is the IPUC-published SAR avoided cost rates for PacifiCorp ('PacifiCorp Avoided Costs Rates For New Contracts', Order No. 37111). Electric Service Schedule No. 38, Qualifying Facility Avoided Cost Procedures, covers QFs above the published-rate caps. | Wind and solar: 100 kW or smaller; non-wind/non-solar: smaller than 10 aMW. Above-cap QFs use Schedule 38 (IRP-based). | By resource type, project online year and contract length; levelized or non-levelized flat price, shaped into Heavy/Light Load Hour prices for each month by monthly weighting factors (e.g. Jan HLH 103%/LLH 94%; Dec HLH 129%/LLH 120%). Wind/solar integration charges column shown 'NA'. Rates are published by IPUC per online year (2026-2031) and contract length (1-20 years), levelized and non-levelized; the 'Rate Effective Date' line in the published PDFs is left as the placeholder 'XXXX XX, 2026'. | 2026-08-03 | 2026-10-04 |
| Kansas | |||||
| Evergy Kansas Central | Schedule PGR, Parallel Generation Rider (Kansas statutory parallel generation purchase under K.S.A. 66-1,184; separate from Net Metering Rider NMR) | 150% tier: residential generators 25 kW or less and commercial, industrial and school generators 200 kW or less; 100% tier: anything larger. Generator must be sized to the customer's load (formula in Condition 11); no upper size limit printed. Statute caps aggregate parallel generation plus net metering export capacity at 7% of historic peak demand from July 1, 2026 (8% from July 1, 2027). | Single per-kWh payment for exported energy: 150% (small) or 100% (large) of the monthly system average cost of energy, computed each month as (F + P + E + EC - NRCA) / (.01 x S) from fuel, purchased power, emissions and environmental-credit costs over retail requirements kWh. No time-of-day or seasonal differentiation. | 2025-01-08 | 2026-10-04 |
| Evergy Kansas Metro | Schedule PG, Parallel Generation Contract Service (Kansas statutory parallel generation purchase under K.S.A. 66-1,184) | 150% tier: residential generators 25 kW or less and commercial, industrial and school generators 200 kW or less; 100% tier: anything larger. Generator must be sized to the customer's load (Condition 11); no upper size limit printed. Statute caps aggregate parallel generation plus net metering export capacity at 7% of historic peak demand from July 1, 2026. | Single per-kWh payment for exported energy: 150% (small) or 100% (large) of the monthly system average cost of energy, computed each month as (F + P + E + EC + T - OSSR) / S from Evergy Metro fuel, purchased power, emissions, environmental-credit and transmission costs net of off-system sales, over kWh delivered to all Evergy Metro customers. No time-of-day or seasonal differentiation. | 2025-01-08 | 2026-10-04 |
| Liberty (Empire) Kansas | Schedule PGS, Parallel Generation Service (K.C.C. Index No. 4) | Standard 150% rate: residential systems less than 25 kW and non-residential systems less than 100 kW. Residential 25 kW to less than 100 kW: negotiated price based on avoided energy cost. Over 100 kW: negotiated under PURPA. | Single per-kWh payment of 150 percent of the average system cost of energy for small systems; negotiated avoided-energy-cost price for residential 25-100 kW; no time-of-day or seasonal differentiation. The tariff does not define how the average system cost of energy is computed or how often it is updated. | 2004-05-24 unverified | 2026-10-04 |
| Kentucky | |||||
| Duke Energy Kentucky | Cogeneration and Small Power Production Sale and Purchase Tariff - 100 kW or Less (KY.P.S.C. Electric No. 2, Ninth Revised Sheet No. 93); identical rates in the Greater Than 100 kW tariff (Tenth Revised Sheet No. 94) | Sheet 93: qualifying facilities of 100 kW or less. Sheet 94 covers facilities greater than 100 kW with the same printed rates; under 807 KAR 5:054 Section 7(4) rates for QFs over 100 kW are the basis for negotiation. | Energy: hourly PJM Real-Time LMP at the DEK Aggregate price node (energy, congestion and losses), converted to $/kWh for each hour of the billing month. Capacity: separate $/kW-month rate by contract start year and contract length. | 2026-05-13 | 2026-10-04 |
| Kentucky Power | Tariff COGEN/SPP (Cogeneration and/or Small Power Production), P.S.C. KY. No. 14, Sheet Nos. 21-1 to 21-4 | PURPA Section 210 QFs: cogeneration facilities with net capacity at or below 20,000 kW; small power production facilities at or below 5,000 kW. | Energy credit at variable LMP at time of delivery (standard meter for all kWh, or time-of-day meter with on-peak 7 a.m.-9 p.m. weekdays and off-peak periods). Separate capacity credit in $/kW-month if the customer contracts for a specified capacity. Options: Option 2 sells excess energy over the customer's load; Option 3 sells total output while buying all load from the company. Monthly metering charges apply. | 2026-03-01 | 2026-10-04 |
| KU (Kentucky Utilities) | Standard Rate Rider SQF, Small Capacity Cogeneration and Small Power Production Qualifying Facilities (Sheet No. 55); Rider LQF (Sheet No. 56) carries the same rates for QFs over 100 kW but they are advisory only | Nameplate capacity of 100 kW or less (Rider SQF). QFs over 100 kW use Rider LQF, where the same rates are only the basis for negotiation (807 KAR 5:054 Section 7(4)). | Flat $/MWh energy rates and separate $/MWh capacity rates by technology, by 2-year or 7-year PPA, and by distribution- or transmission-connected project; no time-of-use or seasonal split. Energy and capacity rates are added to give the All-In Rate. As-available energy (no PPA) is priced on the applicable 2-year PPA rate. | 2026-02-16 | 2026-10-04 |
| Louisville Gas and Electric (LG&E) | Standard Rate Rider SQF, Small Capacity Cogeneration and Small Power Production Qualifying Facilities (Sheet No. 55); Rider LQF (Sheet No. 56) carries the same rates for QFs over 100 kW but they are advisory only | Nameplate capacity of 100 kW or less (Rider SQF). QFs over 100 kW use Rider LQF, where the same rates are only the basis for negotiation (807 KAR 5:054 Section 7(4)). | Flat $/MWh energy rates and separate $/MWh capacity rates by technology, by 2-year or 7-year PPA, and by distribution- or transmission-connected project; no time-of-use or seasonal split. Energy and capacity rates are added to give the All-In Rate. As-available energy (no PPA) is priced on the applicable 2-year PPA rate. | 2026-02-16 | 2026-10-04 |
| Maryland | |||||
| BGE (Baltimore Gas and Electric) | Schedule X, Cogeneration and Small Power Production (Retail Electric Service Tariff P.S.C. Md. E-6, pages 61-62) | No size cap stated. Open to cogeneration and small power production facilities meeting FERC qualification standards. Energy payments require completing the PJM Small Resource Interconnection Process; capacity payments require PJM Capacity Resource status and an indemnification agreement. | Market-indexed, no fixed number. Seller is paid the applicable net PJM locational marginal price (LMP) for the time period when energy is produced and delivered, less ancillary services costs and other related costs. BGE acts as the Seller's agent for PJM sales. | 2010-02-24 | 2026-10-04 |
| Delmarva Power (Maryland) | Service Classification "X" (Cogeneration and Small Power Production), P.S.C. Md. No. 12 - Electric, Leaf Nos. 88-91a; Rider "EP" (Electricity Purchased by the Company from Cogenerators and Small Power Producers), Leaf No. 93 | QFs with generating capacity of 1,000 kW or less. Above 1,000 kW: special contracts at rates 'related to the PJM market value' (Rider EP). | Market-indexed, no fixed number. Delmarva sells the QF's energy in the PJM real-time energy market and pays the hourly energy price received from PJM, less PJM ancillary charges. Existing customers without hourly interval metering are paid the month's average hourly Load Weighted Residual Metered Load Aggregate LMP. The QF pays a $3.01 monthly customer charge plus a monthly meter charge. Default is simultaneous buy/sell; 'net excess' and 'no sale' options are available. | Energy/capacity payment terms and $3.01 customer charge: meter readings on and after July 22, 2015. Monthly meter charges: meter readings on and after May 1, 2026. | 2026-10-04 |
| Pepco (Maryland) | Schedule "CG-SPP" (Cogeneration and Small Power Production Interconnection Service), section "Standard Rate for Power Marketing Service to Small QFs" (P.S.C. Md. No. 1, Third Revised Pages 19-19.4) | Standard rate: QFs interconnected under CG-SPP with a maximum generating capability of 100 kW or less. Larger QFs get market access or negotiated power marketing service, with no standard rate. | Market-indexed, no fixed number. Pepco sells the QF's energy in the PJM as-available (real-time) energy market and pays the energy price received from PJM, less PJM ancillary charges and a fixed monthly administrative charge: $17 at secondary voltage (600 volts or below) or $65 at primary voltage (4kV to 33kV). | Schedule CG-SPP Page 19: usage on and after July 29, 2024 (issued August 6, 2024); Pages 19.1–19.4: usage on and after July 22, 2015 | 2026-10-04 |
| Michigan | |||||
| Consumers Energy | Rule C18, Standard Offer - Purchased Power (M.P.S.C. No. 14 - Electric, Sheets C-74.00 to C-78.00) | QF design capacity 1 kWAC to 5 MWAC. QFs at or below 150 kWAC get the Full Avoided Cost Rate regardless of capacity need; QFs above 150 kWAC up to 5 MWAC get only the LMP-based energy options (Rate Option 1 or 2). | Full Avoided Cost Rate (<=150 kWAC): by-year table (2025-2056) of flat $/kWh energy rates by interconnection voltage (<46 kV vs 46 kV) plus a capacity rate in $/ZRC-Year. Rate Option 1 (As Available): actual MISO day-ahead LMP at CONS.CETR node x (1 + line loss factor) less $0.001/kWh admin fee, 15-year term. Rate Option 2 (LMP Energy Rate Forecast): 10-year term, years 1-5 at scheduled on-peak/off-peak forecast rates by year and voltage, years 6-10 at actual LMP. | 2026-01-30 | 2026-10-04 |
| DTE Electric | Standard Contract Rider No. 5 - Small Power Production and Cogeneration Facilities (M.P.S.C. No. 1 - Electric, Sheets D-78.00 to D-82.00) | Rider available to on-site small power production 5 MW and smaller or cogeneration 20 MW and smaller; the Standard Offer applies to QFs less than or equal to 550 kW (above 550 kW: negotiated agreement). | DTE currently states it has no capacity need, so the 'No Capacity Need' standard offer applies: energy paid at actual day-ahead MISO hourly LMP at the DTE load node for the life of the contract, OR a five-year fixed on-peak/off-peak annual LMP forecast table (by year) followed by actual day-ahead LMP for the rest of the term. A one mill/kWh administrative charge applies. | 2026-02-01 | 2026-10-04 |
| Indiana Michigan Power | Tariff COGEN/SPP (Cogeneration and/or Small Power Production Service), M.P.S.C. 19 - Electric, Sheets D-68.00 to D-74.00 | Standard Service customers with qualifying cogeneration facilities of 20 MW or less (COGEN) or small power production of 5 MW or less (SPP). Capacity and Energy Credit option limited to units capable of generating greater than 20 kW. | Energy-only Credit Option: fixed cents/kWh by year (Standard non-TOD, or TOD on-peak/off-peak) for the first 5 years of the contract, then real-time PJM LMP at an agreed node averaged monthly (or by on/off-peak). Capacity and Energy Credit Option: capacity $/kW-month plus real-time PJM LMP energy. | 2024-07-15 | 2026-10-04 |
| Upper Peninsula Power (UPPCO) | PG-4, D2. Parallel Generation - Purchase by UPPCO (MPSC Vol No 8-Electric, Sheets D-72.70 to D-72.73) | QFs with total customer-owned generating capacity of 550 kW AC or less (larger may negotiate); QFs 150 kW or less may alternatively use PG-2 (or PG-1M if 20 kW or less). | Rate Option 1 (As Available): actual MISO day-ahead LMP at UPPC.INTEGRATED node, loss-adjusted, less $0.001/kWh admin fee. Rate Option 2 (LMP Energy Rate Forecast): fixed on-peak/off-peak prices by year from tariff table for the first 5 years of contract term, then real-time MISO LMP averaged monthly. Distribution loss factors applied by voltage. | 2025-10-09 | 2026-10-04 |
| Minnesota | |||||
| Minnesota Power | Rider for Parallel Generation, Electric Rate Book Volume I, Section V, Page Nos. 60.0-60.9 (Revision 47) | Cogenerators or small power producers less than 1,000 kW AC capacity (tiers: <40 kW; 40 to <500 kW; 500 to <1,000 kW). 1,000 kW AC or more must negotiate a contract. | Flat cents/kWh Simultaneous Purchase and Sale energy credit, or Time-of-Day on-peak/off-peak credits (on-peak 7 a.m.-10 p.m. weekdays); separate 'Energy and Firm Power Capacity Credit' (bundled) for firm power; <40 kW may instead take the Average Retail Energy Rate credit by class; 40-<1,000 kW may take kWh banking with year-end payout at the energy credit. | 2026-07-01 | 2026-10-04 |
| Otter Tail Power | Small Power Producer Rider: Section 12.02 (Simultaneous Purchase and Sale Billing Rate, rate codes M981/M984), Section 12.03 (Time of Day Purchase Rates, M982/M983), Section 12.01 (Net Energy Billing Rate) | 12.02 and 12.03: QFs with generation capacity not exceeding 1,000 kW (above 1,000 kW by negotiation per Minn. R. 7835.4019). 12.01 Option 1 (average retail rate): QFs not exceeding 40 kW; Option 2: 40 kW to less than 1,000 kW. | Seasonal (Summer Jun-Sep / Winter Oct-May) per-kWh energy credits: flat under 12.02, on-peak/off-peak under 12.03; capacity credit per kWh (on-peak only under 12.03) requiring 65% on-peak capacity factor; optional REC rates per kWh. | 2026-04-01 | 2026-10-04 |
| Xcel Energy (NSP-Minnesota) | Minnesota Electric Rate Book MPUC No. 2, Section 9, Sheet 9-3 'Sale to Company After Customer Self-Use', Rate Codes A51 (non-time of day), A52 (time of day), A57 (time of use); related net-excess sheets 9-2 (A50/A60, average retail rate, <40 kW), 9-4 (A53/A54/A58) and 9-4.2 (A55/A56/A59 annual banking) | A51/A52/A57: any qualifying facility of less than 1,000 kW AC capacity. A50/A60 average retail utility energy rate: QFs of less than 40 kW AC. (Tariff defines Small QF as 100 kW AC or less.) | Seasonal (Oct-May vs Jun-Sep) per-kWh energy payments: flat for non-time-of-day customers (A51), on/off-peak for time-of-day customers (A52), on/mid/off-peak for time-of-use customers (A57); plus a seasonal capacity payment per kWh (per on-peak kWh for A52/A57) only when the QF delivers firm power (>=65% on-peak capacity factor in the billing period). | 2026-04-01 | 2026-10-04 |
| Missouri | |||||
| Ameren Missouri | MO.P.S.C. Schedule No. 6, Sheet No. 170-170.4: Electric Power Purchases from Qualifying Facilities (7th Revised Sheet No. 170 carries the standard rates) | Standard rates apply to customers with a design capacity of 500 kW or less. Company is not obligated to enter new contracts with QFs larger than 20,000 kW net capacity (FERC Docket No. QM16-2-000, June 30, 2016). | Two options: (a) non-time-differentiated seasonal energy rate (Summer = June-September billing periods, Winter = October-May); (b) time-differentiated seasonal rates for Weekday 10 AM-10 PM, Weekday 10 PM-10 AM, and Saturday/Sunday/Holiday. A monthly customer charge per meter applies ($4.00/$6.00 single/three phase non-time-differentiated; $13.00/$15.00 time-differentiated). | 2025-03-01 | 2026-10-04 |
| Evergy Missouri Metro | Parallel Generation Contract Service, Schedule PG (P.S.C. MO. No. 7, Sheets 31, 31A, 31B); payment rate on 16th Revised Sheet No. 31A | Not applicable where the Customer's maximum capacity exceeds 100 kW; service at one point of delivery with the generator operating in parallel with the Company's system. Not available for Resale or Time-Related Pricing service. | Single flat payment rate per kWh for all kWh received; no seasonal or time-of-day differentiation. Energy delivered to the Customer is billed under the applicable Residential or General Service schedule. | 2025-02-21 | 2026-10-04 |
| Evergy Missouri West | Parallel Generation Contract Service (Cogeneration Purchase Schedule), P.S.C. MO. No. 1, Sheets 102, 102.1, 102.2; payment rate on 6th Revised Sheet No. 102.1 | Not applicable where the Customer's maximum capacity exceeds 100 kW; service at one point of delivery with the generator operating in parallel. Not available for Resale or Time-Related Pricing service. | Single flat payment rate per kWh for all kWh received; no seasonal or time-of-day differentiation. Energy delivered to the Customer is billed under the applicable Residential or General Service schedule. | 2025-02-21 | 2026-10-04 |
| Liberty (Empire) | Cogeneration Purchase Rate, Schedule CP (P.S.C. Mo. No. 6, Sec. 4, 3rd Revised Sheet No. 6) | Cogenerators with a maximum rated capacity of 100 kW or less that have signed a Purchase Agreement with the Company. | Seasonal flat energy purchase rate per kWh: Summer (June-September) and Winter (October-May). The 2025 filing letter says the marginal costs are projected market prices at the Liberty-specific load node in the SPP Integrated Marketplace. | 2025-02-14 | 2026-10-04 |
| Montana | |||||
| Montana-Dakota Utilities | Rate 93, Power Purchase Time Differentiated (Montana Electric Rate Schedule Volume No. 5, Sheet Nos. 45-45.2), with optional Rate 94 Net Billing Option (Sheet Nos. 46-46.1) | QFs with nameplate capacity of 3 MW or less | Variable hourly market index: actual MISO real-time energy price for Montana-Dakota's load in MISO at the time of delivery, determined hourly. Net Billing Option (Rate 94): net monthly purchases are paid a flat Avoided Cost Energy Payment Rate. Metering charges of $17.55/month (single phase) and $22.45/month (three phase) apply. | 2026-06-01 | 2026-10-04 |
| NorthWestern Energy | Schedule No. QF-1, Qualifying Facility Power Purchase (Electric Tariff Sheet Nos. 74.1-74.5) | 3 MW nameplate or less for standard QF-1 rates. QFs over 3 MW get a negotiated rate not to exceed avoided cost. | Real-time market index, no fixed number. For QFs in NorthWestern's Balancing Authority Area: the CAISO fifteen-minute-market LMP at the assigned pricing node. For QFs outside the BAA: the CAISO fifteen-minute-market price at the DGAP for NorthWestern's BAA. Payment = actual average generation in each 15-minute interval times the energy rate, paid monthly. Ancillary-service costs (OATT, net of a non-variable resource) are deducted from payments. | 2025-07-22 | 2026-10-04 |
| Nevada | |||||
| Nevada Power | Schedule QF – Short Term, Cogeneration and Small Power Production - Qualifying Facilities (Electric Tariff No. 1-B, PUCN Sheet Nos. 32 and 32A) | No size cap printed. Applies to short-term purchases from any QF located in the Company's service area where no other schedule specifically applies. | Hourly market-indexed, all months. Firm energy (on- or off-peak) is paid, each hour, the lesser of the Powerdex Mead/Marketplace and Powerdex California-Oregon Border (COB) hourly index prices. Non-firm energy is paid the lesser of the highest hourly system incremental generation cost or those two hourly index prices. No fixed, seasonal or levelized prices are printed. | 2025-04-01 | 2026-10-04 |
| Sierra Pacific Power | Schedule No. CSPP, Short-Term Rates Cogeneration and Small Power Production (Electric Tariff No. 2, PUCN Sheet Nos. 2 and 3) | No size cap printed; applies to short-term purchases from QFs where no other schedule specifically applies. QFs of 100 kW nameplate or less may choose time-differentiated or non-time-differentiated rates; QFs over 100 kW must use time-differentiated rates. | Hourly market-indexed, all quarters. Time-differentiated: firm energy is paid, each hour, the lesser of the Powerdex COB and Powerdex Mead/Marketplace hourly index prices; non-firm energy the lesser of the highest hourly system incremental generation cost or those two hourly index prices. Non-time-differentiated (QFs of 100 kW or less only): the average of the firm or non-firm hourly rates for the billing period. No fixed, seasonal or levelized prices are printed. | 2025-04-01 | 2026-10-04 |
| New Mexico | |||||
| El Paso Electric | Forty-Fourth Revised Rate No. 16, Purchased Power Service (New Mexico), with monthly 'New Mexico Purchase Power Factors for Qualifying Facilities' sheets | QFs up to 80 MW ('small' under 18 CFR 292.204(a)). Monthly average rate for QFs rated 5 MW and below; hourly ELAP pricing above 5 MW. 17.9.568 NMAC controls for customer-owned QFs of 100 kW or smaller where inconsistent with the tariff. | QFs 5 MW and below: one per-kWh rate per billing month equal to the average of Western EIM EPE System ELAP prices times Rate No. 18 voltage loss adjustments, published monthly by voltage (secondary, primary, 69 kV, 115 kV) as Non-TOD, On-Peak and Off-Peak rates and applied to excess generated kWh. QFs above 5 MW: hourly ELAP price x loss adjustment x actual hourly production. | Rate No. 16 (44th Revised): 2024-08-01. Payment factors in effect: those billed in October 2026. | 2026-10-04 |
| PNM | 56th Revised Rate No. 12, Cogeneration and Small Power Production Facilities (canceling 55th Revised Rate No. 12) | Published monthly rate tables: QFs rated 5 MW and below. QFs above 5 MW are paid hourly ELAP prices times a loss factor. QFs rated 10 kW or less: Rule 570.14 (net metering) provisions apply. | QFs 5 MW and below: a 12-month table (March through February) of per-kWh energy rates by interconnection voltage (secondary, primary, substation, sub-transmission, transmission) and costing period matching the QF's retail schedule (TOU on/off-peak, RTOD/TOD on/off-peak, TOD super off-peak, non-TOU); a separate solar 'All Daylight Hours' rate at primary voltage. Some printed values are negative (shown in parentheses); rates applied to bills are not less than $0.00/kWh. QFs above 5 MW: actual hourly production x hourly ELAP price x voltage loss factor. | 2026-03-01 unverified | 2026-10-04 |
| Xcel Energy (SPS) | Thirty-Third Revised Rate No. 4, Purchases from Qualifying Facilities (Tariff No. 3018.33) | All QF sizes, in three classes: Small QF 10 kW or less; Intermediate QF more than 10 kW but less than 1 MW; Large QF 1 MW or greater (each settled differently). | As-available energy paid per settlement interval at SPP prices x a QF-specific loss factor: QFs self-registered in the SPP Market get the Day-Ahead LMP on scheduled MWh; Large QFs registered by SPS get the Real-Time LMP less SPP charges; Intermediate and Small QFs get the Real-Time LMP at the electrically closest Settlement Location. $215.00 per month charge if the QF is not an SPS New Mexico retail customer. | 2014-04-05 unverified | 2026-10-04 |
| North Carolina | |||||
| Dominion Energy North Carolina | Schedule 19-FP, Power Purchases from Cogeneration and Small Power Production Qualifying Facilities | Contracted Capacity no greater than 1,000 kW and no more than 1,000 kWh purchased at firm-delivery rates in any hour; Non-time-differentiated energy-only option limited to 100 kW or less | Energy is not a fixed tariff number: all energy payments are at the PJM Day-Ahead LMP for the node closest to the QF (hourly LMP for time-differentiated and Fixed Mode; monthly average of hourly DA LMP for non-time-differentiated <=100 kW), divided by 10 to get cents/kWh | 2026-10-02 | 2026-10-04 |
| Duke Energy Carolinas | Purchased Power Schedule PP (NC Seventeenth Revised Leaf No. 90, Electricity No. 4) | Contract Capacity of 1 MW or less (nameplate). Footnote: once 100 MW aggregate of post-Nov 16, 2016 LEO PPAs are executed, 'Monthly Rates' only available to sellers of 100 kW or less. | Time-of-use energy credits (cents/kWh) by season (Summer Jun-Sep, Winter Dec-Feb, Shoulder) with on-peak, premium-peak and off-peak periods; separate columns for Two-Year Fixed Rate vs Fixed Long-Term Rate (10 years), each for distribution- vs transmission-interconnected; separate rows for uncontrolled solar. Hourly As-Available Rates (marginal cost, computed monthly after the fact) also offered. | 2025-11-03 | 2026-10-04 |
| Duke Energy Progress | Purchased Power Schedule PP (NC Fourth Revised Leaf No. 590) | Contract Capacity of 1 MW or less (nameplate). Same 100 MW aggregate / 100 kW 'Monthly Rates' footnote as DEC. | Time-of-use energy credits (cents/kWh) by season with on-peak, premium-peak and off-peak periods; Two-Year Fixed vs Fixed Long-Term (10 years) columns, distribution vs transmission; separate uncontrolled-solar rows. Hourly As-Available Rates also offered. Payments for QFs of 10 kW or less only on a calendar-year basis. | 2025-11-03 | 2026-10-04 |
| Oregon | |||||
| Idaho Power | Schedule 85, Cogeneration and Small Power Production Standard Contract Rates (Oregon) | 10 MW AC nameplate for standalone solar, solar+storage (combined) and non-solar QFs. Interim solar+storage prices are limited to a 50 MW AC system cap. On-system QFs must take NRIS, and QFs taking ERIS need a Non-Standard Contract. | Annual On-Peak and Off-Peak $/MWh prices by year from 2026 to 2050, multiplied by a monthly Seasonality Factor: 73.50% in March-May; 120.00% in July, August, November and December; 100.00% in other months. On-Peak is HE 0700-2200 Mountain Time excluding Sundays and holidays (16 hours). Wind and solar prices are shown net of integration charges. 2026 is market-based; capacity value starts in 2027. Solar+storage gets Premium Peak and Non-Premium prices. | 2026-03-18 | 2026-10-04 |
| Pacific Power (PacifiCorp) | Oregon Standard Avoided Cost Rates – Avoided Cost Purchases From Eligible Qualifying Facilities (formerly Schedule 37) | 10,000 kW nameplate for Baseload, Solar, Solar and Storage, and Wind QFs since 2025-09-02. The size test aggregates same-owner, same-motive-force facilities at the same site (within 5 miles). On-system QFs must take NRIS. Interim Solar and Storage prices close at 50,000 kW cumulative, except for projects of 100 kW or less. | Annual On-Peak and Off-Peak energy prices in ¢/kWh by calendar year from 2025 to 2045, for each resource type, in Standard Fixed and Renewable Fixed tables. On-Peak is 6 a.m. to 10 p.m. PPT Monday-Saturday, excluding NERC holidays. Interim Solar and Storage gets monthly Premium Peak and Off-Peak prices. Wind and solar prices are net of integration charges, which are added back for QFs outside PacifiCorp's BAA. The Sufficiency Period ends 2026-12-31. Firm and non-firm market-index options are also offered. | 2025-07-01 | 2026-10-04 |
| Portland General Electric | Schedule 201, Qualifying Facility 10 MW or Less Avoided Cost Power Purchase Information (Sheet Nos. 201-1 to 201-30) | 10 MW nameplate for all QF types, including solar and solar-plus-storage, since 2025-09-25 under HB 3863. Earlier, solar and solar+storage were capped at 3 MW. The cap aggregates same-motive-force facilities of the same owner within a five-mile radius. On-system QFs must take NRIS. Interim solar-plus-storage rates close after 50 MW aggregate, except for QFs of 100 kW or less. | Time-of-use by month and year. Tables give monthly On-Peak and Off-Peak $/MWh for each year from 2025 to 2050, by resource type, for non-renewable (Tables 1-4) and renewable (Tables 5-8) prices. On-Peak is 6:00 a.m. to 10:00 p.m. Monday-Saturday. Solar+storage is paid Premium Peak and Off-Peak prices. Wind and solar prices are net of integration costs (Table 9), which are added back for QFs outside PGE's Balancing Authority Area. As-Available QFs get 82.4% of the ICE Mid-C index. | 2025-06-25 | 2026-10-04 |
| South Carolina | |||||
| Dominion Energy South Carolina | Rate PR - Standard Offer, for Small Power Producers of 2 MW or Less under PURPA and S.C. Act No. 62 of 2019 | Power production capacity less than or equal to 2 MW (PPA: combined with affiliate QFs within one mile, up to 2 MW-AC) | Seasonal time-of-use energy credits ($/kWh) for Winter, Shoulder and Summer with 3-4 hour blocks each, stated separately for 2026-2030 and 2031-2035 periods | first billing cycle of January 2026 | 2026-10-04 |
| Duke Energy Carolinas | Schedule PP, Purchased Power (SC Eleventh Revised Leaf No. 90) | Contract Capacity of 2 MW or less (nameplate), per S.C. Act 62 standard offer definition (up to 2 MW AC) | Time-of-use energy credits (cents/kWh) by season with on-peak, premium-peak and off-peak periods; columns for Two-Year Fixed Rate, Fixed Long-Term 5 years and 10 years, each for distribution vs transmission interconnection. Hourly As-Available Rates also offered. | 2025-03-03 | 2026-10-04 |
| Duke Energy Progress | Purchased Power Schedule PP (SC Second Revised Leaf No. 590; listed on SC e-Tariff as 'Purchased Power Schedule PP-2') | Contract Capacity of 2 MW or less (nameplate) | Time-of-use energy credits (cents/kWh) by season with on-peak, premium-peak and off-peak periods; columns for Two-Year Fixed, Fixed Long-Term 5 years and 10 years, distribution vs transmission. Hourly As-Available Rates also offered. | 2026-02-01 | 2026-10-04 |
| Utah | |||||
| Rocky Mountain Power | Electric Service Schedule No. 37, Avoided Cost Purchases from Qualifying Facilities (P.S.C.U. No. 52) | Design capacity up to 1,000 kW for a Cogeneration Facility or up to 3,000 kW for a Small Power Production facility; cumulative cap of 25,000 kW for new resources under the schedule. | Time-of-use and seasonal: On-Peak (6 a.m.-10 p.m. Mon-Sat excl. holidays) and Off-Peak prices for Winter (Oct-May) and Summer (Jun-Sep); non-levelized by calendar year 2026-2045 or nominal levelized for a 15-year contract (2027-2041). Solar/wind prices are net of integration charges. Non-firm QFs are paid hourly WEIM prices instead. | 2026-10-01 | 2026-10-04 |
| Virginia | |||||
| Appalachian Power | Schedule COGEN/SPP (Cogeneration and/or Small Power Production Service), VA. S.C.C. Tariff No. 28, Sheets 20-1 to 20-3 | QFs with net design capacity of 5 MW or less taking Standard Service. Larger QFs: the Company 'reserves the right to negotiate' on an individual case basis (the sheet prints 'greater than 5MW and less than 5MW', an apparent typo). | Market-indexed: hourly output times the hourly PJM day-ahead LMP at the node or aggregate of nodes representing the company's load price, adjusted for losses by factor (Secondary 1.11301, Primary 1.06134). Energy payments may be reduced by PJM Operating Reserve Balancing Charges if the QF causes significant real-time deviations. Program Charge $25.00 per month; interval metering and interconnection costs charged to the customer. | 2025-01-01 | 2026-10-04 |
| Dominion Energy Virginia | Schedule 19, Power Purchases from Cogeneration and Small Power Production Qualifying Facilities | Cogenerators with net capacity of 20,000 kW or less; small power producers with net capacity of 5,000 kW or less. Energy-only option only for QFs of 10 kW or less. Developers may not site Schedule 19 facilities within one-half mile of each other unless an exception applies (e.g. renewable resources with siting limits). Available to QFs reaching commercial operation on or after September 15, 2021. | Market-indexed. Energy-and-capacity QFs: hourly price in cents per kWh equal to the hourly PJM Dom Zone day-ahead LMP ($/MWh) divided by 10, times hourly net generation. Energy-only QFs (10 kW or less): monthly average of the hourly Dom Zone DA LMP divided by 10. All energy prices increased by 2.8% for avoided line losses (or a site-specific study at the QF's cost), fixed for the contract term. Monthly meter reading and processing charge billed to the QF: $6.56 (one non-time differentiated meter), $76.73 (one time differentiated meter), $120.96 (two time differentiated meters). | 2024-01-01 | 2026-10-04 |
| Washington | |||||
| Avista | Schedule 62, Small Power Production and Cogeneration Schedule (Qualifying Facilities – Washington), Tariff WN U-28 | 5 MW-AC nameplate or less for standard rates. Larger QFs get IRP-based rates. | Time-of-delivery matrix. 'Non-Capacity Energy Values' are given by month, by HLH (6 a.m.-10 p.m. all days) or LLH, and by delivery year for 2026-2045, for each resource. A levelized capacity adder ($/MWh, all hours) is set by the first delivery year and paid on every MWh over the contract. Separate New (15-year) and Renew (10-year) rows. An 'Estimated 2026 Combined Average Annual Rate' is shown for illustration only. Standard rates include RECs, which pass to Avista. Short-term and as-available options pay the Powerdex hourly Mid-C index. | 2026-01-01 | 2026-10-04 |
| Pacific Power (PacifiCorp) | Schedule QF, Avoided Cost Purchases and Procedures for Qualifying Facilities (Tariff WN U-76). PacifiCorp's Washington QF tariff is Schedule QF, not Schedule 37. | 5 MW nameplate or less ('Standard QFs'). Larger QFs negotiate under the non-standard methodology. | Seasonal time-of-use. Table A gives combined energy and capacity contract prices in $/MWh by year, with four periods: On-Peak Winter (6-8 a.m. and 5-11 p.m. PPT, October-May), Off-Peak Winter, On-Peak Summer (2-10 p.m. PPT, June-September) and Off-Peak Summer. It also shows an illustrative weighted average and a Clean Energy Premium column. Tables B, C and D give the energy, capacity and integration components. Prices are net of integration charges for in-BAA QFs. Firm and non-firm (85%) market-index options are also offered. | 2026-01-01 | 2026-10-04 |
| Puget Sound Energy | Schedule 91, Purchases from Qualifying Facilities of Five Megawatts or Less (Tariff WN U-60) | 5 MW nameplate or less | Flat $/MWh fixed rates by year of delivery (2026-2041 tables), with no time-of-use split. Separate columns by resource and by delivery point (distribution or transmission). The rates combine energy and capacity. Section 4.D also gives current-year (2026) distribution-delivery rates, both combined and energy-only. Table No. 1 is an informational monthly Mid-C avoided energy forecast for 2026-2045, not a contract price. | 2026-01-01 | 2026-10-04 |
| Wisconsin | |||||
| Alliant Energy (WPL) | Schedule PgS-1, Parallel Generation - (In Excess of 20 kW), Sheets 7.75–7.79; Schedule PgS-3 (20 kW or less) pays non-renewable generators the PgS-1 standard avoided cost energy rates | Customers taking service under another rate schedule with generation rated in excess of 20 kW-ac but not in excess of 5,000 kW-ac (aggregated across conjunctively billed accounts). Generation of 20 kW or less: Schedule PgS-3. | Energy credit per kWh by pricing period (High, Regular, Low) and service voltage (Transmission/Primary/Secondary). High Rate: weekdays 11 a.m.–7 p.m. in summer (June–August) and 5–9 p.m. in winter (December–February); Low Rate: 11 p.m.–6 a.m. weekdays and all weekend/holiday hours; Regular: all other hours. Capacity credit paid per kWh in the High Rate period. | 2026-01-01 | 2026-10-04 |
| We Energies | Rate Schedule CGS DS-FP, Customer Generating Systems – Direct Sale – Fixed Price, 5 MW or less (sell-all QFs; Sheets 201.9–201.10.1); Rate Schedule CGS-CU, Customer Generating Systems – Customer Use, 5 MW or less (QFs on a time-of-use retail rate selling excess; Sheets 201.11–201.14) | CGS DS-FP: certified QFs with total generating capacity of 5 MW or less, all output sold to the Company, connected through a Company generation meter with no other load except generator auxiliaries. CGS-CU: QF customers on a time-of-use retail rate with on-premises generation of 5 MW or less. | Avoided Energy Cost Rate per kWh, not subject to fuel or other adjustments: one flat all-hours rate for residential/secondary flat-rate customers; on-peak/off-peak rates by Summer (June 1–September 30) and Non-Summer (October 1–May 31) for time-of-use secondary customers and for primary customers in three voltage tiers. DS-FP on-peak is 8:00 a.m.–8:00 p.m. weekdays excluding six holidays. Avoided Transmission Cost Rate $0.00000 per kWh. | Energy rates (Sheets 201.10, 201.12): 2026-01-01; capacity rates (Sheets 201.10.1, 201.13): 2026-06-01 | 2026-10-04 |
| Wisconsin Public Service (WPS) | Schedule PG-2A, Parallel Generation-Purchase by WPSC (sell-all QFs; Sheets E4.15–E4.18) and Schedule PG-2B, Parallel Generation-Purchase by WPSC (QF customers on a time-of-use rate selling to the Company; Sheets E4.19–E4.20.1) | PG-2A: certified QFs with total generating capacity of 5,000 kW or less, all output purchased by the Company, directly connected via a Company generation meter with no other load except generator auxiliaries. PG-2B: QF customers on a time-of-use rate with customer-owned capacity of 5,000 kW or less. | Avoided Energy Cost Rate per kWh, not subject to fuel or other adjustments, by on-peak/off-peak, Winter (October–May)/Summer (June–September) and service voltage (Secondary/Primary/Transmission). On-peak: 7:00 AM–10:00 PM winter, 7:00 AM–11:00 PM summer, Monday–Friday except holidays. Avoided Transmission Cost Rate $0.00000 per kWh. | Energy rates: 2026-01-01; capacity rates: 2026-06-01 | 2026-10-04 |
| Xcel Energy (NSP-Wisconsin) | Schedule Pg-2A, Parallel Generation - Sale to Company (sell-all QFs; Sheets E 56.4–56.51) and Schedule Pg-2B, Parallel Generation – Sale to Company After Customer Self-Supply (Sheets E 56.6–56.61) | Pg-2A: certified QFs with nameplate capacity of 5,000 kW-AC or less, all production purchased by the Company. Pg-2B: retail customers with QF generation of 1,000 kW-AC or less, deliveries may follow self-supply. | Per-kWh energy credits: on-peak (June–September and October–May rates) and a single off-peak rate, plus a transmission credit on all kWh; loss factors by metering level (1.02659 transmission untransformed to 1.07911 secondary) are applied to the credits. On-peak: 9:00 a.m.–9:00 p.m. Monday–Friday excluding holidays. | 2026-01-01 | 2026-10-04 |
| Wyoming | |||||
| Cheyenne Light (Black Hills Energy) | Standard Rate for Purchasing Power from Qualifying Small Power Production or Cogeneration Facilities Greater Than 25 kW (Wyo. P.S.C. Tariff No. 14, Original Sheet Nos. 42-44) | Published rate for QFs greater than 25 kW up to 1 MW; QFs 1 MW and greater require a negotiated Power Purchase Agreement. Net-metering customers' unused year-end kWh credits are also bought at this rate. | Single flat Energy Purchase Rate for all generation measured at a production meter (no time-of-use or seasonal split); $50/month production meter charge; consumption billed separately under the applicable retail schedule (not net metered). | 2023-03-01 | 2026-10-04 |
| Montana-Dakota Utilities | Parallel Generation Rate 57 (W.P.S.C. Tariff No. 2, Original Sheet Nos. 70 and 70.1) | Published Parallel Generation rates (energy plus capacity) apply to QF facilities rated 100 kW or less; facilities 101 kW and greater get individual agreements. Partial Requirements Customers (self-supply facilities above the 25 kW net-metering limit) receive the energy payment only. | Flat energy payment per kWh received (no time-of-use or seasonal split), plus a monthly capacity payment per kW for qualifying Parallel Generation Customers 100 kW or less; customer pays a monthly Basic Service Charge and is billed for its own usage at its retail class rate (not net metered). | 2026-04-01 | 2026-10-04 |
| Rocky Mountain Power | Schedule 37, Avoided Cost Purchases from Qualifying Facilities (P.S.C. Wyoming No. 19) | Firm power: QFs with capacity factor up to 70% and design capacity up to 1 MW; hydro up to 5 MW; hydro or other projects with capacity factor above 70% up to 10 MW of average monthly capacity. All non-firm QF energy under Commission jurisdiction. Schedule 37 prices apply until 10 MW of system resources are acquired under the schedule. | Firm: non-levelized annual prices by deliveries year (2026-2046), On-Peak and Off-Peak for Winter (Oct-May) and Summer (Jun-Sep). On-peak: summer 3-10 p.m.; winter 5-8 a.m. and 5-11 p.m., Pacific Prevailing Time, all days. Non-firm: hourly WEIM price (average of four 15-minute market prices) at the QF's location. | 2026-04-30 | 2026-10-04 |
Text is copied from each utility's tariff or the commission order. Open a utility for every field, its sources, any unverified flags and when the rates are due to change.