by Hundred Dollar Labs

All utilities › Minnesota › Otter Tail Power

Otter Tail Power, Minnesota: PURPA avoided-cost rates

Otter Tail Power Company (Minnesota): what it publishes for small generators (qualifying facilities) under PURPA, field by field, with the source for each. Checked on October 4, 2026.

When this may change: Annual: Minn. R. 7835.0300 requires each utility to file its cogeneration and small power production tariff every 12 months.

Rates, eligibility and contract terms change: confirm them with the utility or the state utility commission before relying on them.

ScheduleSmall Power Producer Rider: Section 12.02 (Simultaneous Purchase and Sale Billing Rate, rate codes M981/M984), Section 12.03 (Time of Day Purchase Rates, M982/M983), Section 12.01 (Net Energy Billing Rate)Source: otpco.com: mn_1202.pdf · also: otpco.com: mn_1203.pdf · checked 2026-10-04
Docket or orderMPUC Docket No. E999/PR-26-09 (annual cogeneration/small power production filing), approved March 17, 2026

Note: Rate pages of 12.01 and 12.03 print Docket No. E999/PR-26-09; the 12.02 rate page prints Docket No. E017/M-26-09 with the same March 17, 2026 approval date.

Source: otpco.com: mn_1203.pdf · also: otpco.com: mn_1202.pdf, otpco.com: mn_1201.pdf · checked 2026-10-04
Effective date2026-04-01

Note: Effective with bills rendered on and after April 1, 2026 (payment-schedule pages of 12.01, 12.02, 12.03).

Source: otpco.com: mn_1202.pdf · checked 2026-10-04
Next updateAnnual: Minn. R. 7835.0300 requires each utility to file its cogeneration and small power production tariff every 12 months.Source: revisor.mn.gov: 7835.0300 · checked 2026-10-04
Size cap12.02 and 12.03: QFs with generation capacity not exceeding 1,000 kW (above 1,000 kW by negotiation per Minn. R. 7835.4019). 12.01 Option 1 (average retail rate): QFs not exceeding 40 kW; Option 2: 40 kW to less than 1,000 kW.Source: otpco.com: mn_1202.pdf · also: otpco.com: mn_1201.pdf · checked 2026-10-04
Resource typesAny cogeneration or small power production QF under 18 CFR Part 292; optional REC payments differ for wind and solar.Source: otpco.com: mn_1202.pdf · checked 2026-10-04
Energy rate structureSeasonal (Summer Jun-Sep / Winter Oct-May) per-kWh energy credits: flat under 12.02, on-peak/off-peak under 12.03; capacity credit per kWh (on-peak only under 12.03) requiring 65% on-peak capacity factor; optional REC rates per kWh.Source: otpco.com: mn_1202.pdf · checked 2026-10-04
Energy rates (sample cells)
Cell (as labelled, with vintage)RateUnits
12.02 Simultaneous Purchase and Sale, Firm and Non-Firm Power, Summer energy credit$0.04595$/kWh
12.02 Simultaneous Purchase and Sale, Firm and Non-Firm Power, Winter energy credit$0.04559$/kWh
12.03 Time of Day, On-Peak energy credit, SummerFrom otpco.com: mn_1203.pdf$0.05681$/kWh
12.03 Time of Day, On-Peak energy credit, WinterFrom otpco.com: mn_1203.pdf$0.05248$/kWh
12.03 Time of Day, Off-Peak energy credit, SummerFrom otpco.com: mn_1203.pdf$0.03703$/kWh
12.03 Time of Day, Off-Peak energy credit, WinterFrom otpco.com: mn_1203.pdf$0.04007$/kWh

Copied as printed: a few labelled cells, not the full rate matrix. The whole schedule is linked below.

Note: Items carry their own source: 12.02 rates from mn_1202.pdf, 12.03 time-of-day rates from mn_1203.pdf.

Source: otpco.com: mn_1202.pdf · also: otpco.com: mn_1203.pdf · checked 2026-10-04
Capacity payment12.02: capacity credit $0.02022 per kWh (summer and winter); 12.03: capacity payment on-peak only $0.04332 per kWh (summer and winter); if the QF does not meet the 65% on-peak capacity requirement in a month, compensation is energy only. 12.01 Option 2 firm power capacity credit $0.02022 per kWh.Source: otpco.com: mn_1202.pdf · also: otpco.com: mn_1203.pdf · checked 2026-10-04
Contract termsUniform Statewide Contract in the form prescribed by Minn. R. 7835.9910 (tariff: 'may include, among other provisions, a minimum term of service'); the rule's form contract stays in force until either party gives written notice and is canceled 30 days after notice.Source: otpco.com: mn_1201.pdf · also: revisor.mn.gov: 7835.9910 · checked 2026-10-04
Price fixityVariable: payment schedule reset annually via the Minn. R. 7835 filing ('The schedule for these payments is subject to annual review').Source: otpco.com: mn_1201.pdf · checked 2026-10-04
Schedule linkhttps://www.otpco.com/media/hosbhns1/mn_1202.pdf

Note: Companion sheets: 12.03 https://www.otpco.com/media/5uldiggt/mn_1203.pdf; 12.01 https://www.otpco.com/media/uvplwynh/mn_1201.pdf

Source: otpco.com: mn_1202.pdf · checked 2026-10-04

Values are copied as printed in the source. Where a value draws on more than one document, every source is listed, primary first.

Also in Minnesota: Minnesota Power, Xcel Energy (NSP-Minnesota). All 59 utilities. Get every utility as CSV/JSON.