All utilities › Minnesota › Otter Tail Power
Otter Tail Power Company (Minnesota): what it publishes for small generators (qualifying facilities) under PURPA, field by field, with the source for each. Checked on October 4, 2026.
When this may change: Annual: Minn. R. 7835.0300 requires each utility to file its cogeneration and small power production tariff every 12 months.
Rates, eligibility and contract terms change: confirm them with the utility or the state utility commission before relying on them.
| Schedule | Small Power Producer Rider: Section 12.02 (Simultaneous Purchase and Sale Billing Rate, rate codes M981/M984), Section 12.03 (Time of Day Purchase Rates, M982/M983), Section 12.01 (Net Energy Billing Rate)Source: otpco.com: mn_1202.pdf · also: otpco.com: mn_1203.pdf · checked 2026-10-04 | |||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Docket or order | MPUC Docket No. E999/PR-26-09 (annual cogeneration/small power production filing), approved March 17, 2026 Note: Rate pages of 12.01 and 12.03 print Docket No. E999/PR-26-09; the 12.02 rate page prints Docket No. E017/M-26-09 with the same March 17, 2026 approval date. Source: otpco.com: mn_1203.pdf · also: otpco.com: mn_1202.pdf, otpco.com: mn_1201.pdf · checked 2026-10-04 | |||||||||||||||||||||
| Effective date | 2026-04-01 Note: Effective with bills rendered on and after April 1, 2026 (payment-schedule pages of 12.01, 12.02, 12.03). Source: otpco.com: mn_1202.pdf · checked 2026-10-04 | |||||||||||||||||||||
| Next update | Annual: Minn. R. 7835.0300 requires each utility to file its cogeneration and small power production tariff every 12 months.Source: revisor.mn.gov: 7835.0300 · checked 2026-10-04 | |||||||||||||||||||||
| Size cap | 12.02 and 12.03: QFs with generation capacity not exceeding 1,000 kW (above 1,000 kW by negotiation per Minn. R. 7835.4019). 12.01 Option 1 (average retail rate): QFs not exceeding 40 kW; Option 2: 40 kW to less than 1,000 kW.Source: otpco.com: mn_1202.pdf · also: otpco.com: mn_1201.pdf · checked 2026-10-04 | |||||||||||||||||||||
| Resource types | Any cogeneration or small power production QF under 18 CFR Part 292; optional REC payments differ for wind and solar.Source: otpco.com: mn_1202.pdf · checked 2026-10-04 | |||||||||||||||||||||
| Energy rate structure | Seasonal (Summer Jun-Sep / Winter Oct-May) per-kWh energy credits: flat under 12.02, on-peak/off-peak under 12.03; capacity credit per kWh (on-peak only under 12.03) requiring 65% on-peak capacity factor; optional REC rates per kWh.Source: otpco.com: mn_1202.pdf · checked 2026-10-04 | |||||||||||||||||||||
| Energy rates (sample cells) |
Copied as printed: a few labelled cells, not the full rate matrix. The whole schedule is linked below. Note: Items carry their own source: 12.02 rates from mn_1202.pdf, 12.03 time-of-day rates from mn_1203.pdf. Source: otpco.com: mn_1202.pdf · also: otpco.com: mn_1203.pdf · checked 2026-10-04 | |||||||||||||||||||||
| Capacity payment | 12.02: capacity credit $0.02022 per kWh (summer and winter); 12.03: capacity payment on-peak only $0.04332 per kWh (summer and winter); if the QF does not meet the 65% on-peak capacity requirement in a month, compensation is energy only. 12.01 Option 2 firm power capacity credit $0.02022 per kWh.Source: otpco.com: mn_1202.pdf · also: otpco.com: mn_1203.pdf · checked 2026-10-04 | |||||||||||||||||||||
| Contract terms | Uniform Statewide Contract in the form prescribed by Minn. R. 7835.9910 (tariff: 'may include, among other provisions, a minimum term of service'); the rule's form contract stays in force until either party gives written notice and is canceled 30 days after notice.Source: otpco.com: mn_1201.pdf · also: revisor.mn.gov: 7835.9910 · checked 2026-10-04 | |||||||||||||||||||||
| Price fixity | Variable: payment schedule reset annually via the Minn. R. 7835 filing ('The schedule for these payments is subject to annual review').Source: otpco.com: mn_1201.pdf · checked 2026-10-04 | |||||||||||||||||||||
| Schedule link | https://www.otpco.com/media/hosbhns1/mn_1202.pdf Note: Companion sheets: 12.03 https://www.otpco.com/media/5uldiggt/mn_1203.pdf; 12.01 https://www.otpco.com/media/uvplwynh/mn_1201.pdf Source: otpco.com: mn_1202.pdf · checked 2026-10-04 |
Values are copied as printed in the source. Where a value draws on more than one document, every source is listed, primary first.
Also in Minnesota: Minnesota Power, Xcel Energy (NSP-Minnesota). All 59 utilities. Get every utility as CSV/JSON.