by Hundred Dollar Labs

All utilities › Oregon

Oregon PURPA avoided-cost rates

The standard-offer rates for small generators (qualifying facilities) published by 3 investor-owned utilities we cover in Oregon: Idaho Power, Pacific Power (PacifiCorp) and Portland General Electric. Checked on October 4, 2026.

UtilityScheduleSize capRate structureEffectiveChecked on
Idaho PowerSchedule 85, Cogeneration and Small Power Production Standard Contract Rates (Oregon)10 MW AC nameplate for standalone solar, solar+storage (combined) and non-solar QFs. Interim solar+storage prices are limited to a 50 MW AC system cap. On-system QFs must take NRIS, and QFs taking ERIS need a Non-Standard Contract.Annual On-Peak and Off-Peak $/MWh prices by year from 2026 to 2050, multiplied by a monthly Seasonality Factor: 73.50% in March-May; 120.00% in July, August, November and December; 100.00% in other months. On-Peak is HE 0700-2200 Mountain Time excluding Sundays and holidays (16 hours). Wind and solar prices are shown net of integration charges. 2026 is market-based; capacity value starts in 2027. Solar+storage gets Premium Peak and Non-Premium prices.2026-03-182026-10-04
Pacific Power (PacifiCorp)Oregon Standard Avoided Cost Rates – Avoided Cost Purchases From Eligible Qualifying Facilities (formerly Schedule 37)10,000 kW nameplate for Baseload, Solar, Solar and Storage, and Wind QFs since 2025-09-02. The size test aggregates same-owner, same-motive-force facilities at the same site (within 5 miles). On-system QFs must take NRIS. Interim Solar and Storage prices close at 50,000 kW cumulative, except for projects of 100 kW or less.Annual On-Peak and Off-Peak energy prices in ¢/kWh by calendar year from 2025 to 2045, for each resource type, in Standard Fixed and Renewable Fixed tables. On-Peak is 6 a.m. to 10 p.m. PPT Monday-Saturday, excluding NERC holidays. Interim Solar and Storage gets monthly Premium Peak and Off-Peak prices. Wind and solar prices are net of integration charges, which are added back for QFs outside PacifiCorp's BAA. The Sufficiency Period ends 2026-12-31. Firm and non-firm market-index options are also offered.2025-07-012026-10-04
Portland General ElectricSchedule 201, Qualifying Facility 10 MW or Less Avoided Cost Power Purchase Information (Sheet Nos. 201-1 to 201-30)10 MW nameplate for all QF types, including solar and solar-plus-storage, since 2025-09-25 under HB 3863. Earlier, solar and solar+storage were capped at 3 MW. The cap aggregates same-motive-force facilities of the same owner within a five-mile radius. On-system QFs must take NRIS. Interim solar-plus-storage rates close after 50 MW aggregate, except for QFs of 100 kW or less.Time-of-use by month and year. Tables give monthly On-Peak and Off-Peak $/MWh for each year from 2025 to 2050, by resource type, for non-renewable (Tables 1-4) and renewable (Tables 5-8) prices. On-Peak is 6:00 a.m. to 10:00 p.m. Monday-Saturday. Solar+storage is paid Premium Peak and Off-Peak prices. Wind and solar prices are net of integration costs (Table 9), which are added back for QFs outside PGE's Balancing Authority Area. As-Available QFs get 82.4% of the ICE Mid-C index.2025-06-252026-10-04

When these rates change next

Rates, eligibility and contract terms change: confirm them with the utility or the state utility commission before relying on them.