All utilities › Oregon
The standard-offer rates for small generators (qualifying facilities) published by 3 investor-owned utilities we cover in Oregon: Idaho Power, Pacific Power (PacifiCorp) and Portland General Electric. Checked on October 4, 2026.
| Utility | Schedule | Size cap | Rate structure | Effective | Checked on |
|---|---|---|---|---|---|
| Idaho Power | Schedule 85, Cogeneration and Small Power Production Standard Contract Rates (Oregon) | 10 MW AC nameplate for standalone solar, solar+storage (combined) and non-solar QFs. Interim solar+storage prices are limited to a 50 MW AC system cap. On-system QFs must take NRIS, and QFs taking ERIS need a Non-Standard Contract. | Annual On-Peak and Off-Peak $/MWh prices by year from 2026 to 2050, multiplied by a monthly Seasonality Factor: 73.50% in March-May; 120.00% in July, August, November and December; 100.00% in other months. On-Peak is HE 0700-2200 Mountain Time excluding Sundays and holidays (16 hours). Wind and solar prices are shown net of integration charges. 2026 is market-based; capacity value starts in 2027. Solar+storage gets Premium Peak and Non-Premium prices. | 2026-03-18 | 2026-10-04 |
| Pacific Power (PacifiCorp) | Oregon Standard Avoided Cost Rates – Avoided Cost Purchases From Eligible Qualifying Facilities (formerly Schedule 37) | 10,000 kW nameplate for Baseload, Solar, Solar and Storage, and Wind QFs since 2025-09-02. The size test aggregates same-owner, same-motive-force facilities at the same site (within 5 miles). On-system QFs must take NRIS. Interim Solar and Storage prices close at 50,000 kW cumulative, except for projects of 100 kW or less. | Annual On-Peak and Off-Peak energy prices in ¢/kWh by calendar year from 2025 to 2045, for each resource type, in Standard Fixed and Renewable Fixed tables. On-Peak is 6 a.m. to 10 p.m. PPT Monday-Saturday, excluding NERC holidays. Interim Solar and Storage gets monthly Premium Peak and Off-Peak prices. Wind and solar prices are net of integration charges, which are added back for QFs outside PacifiCorp's BAA. The Sufficiency Period ends 2026-12-31. Firm and non-firm market-index options are also offered. | 2025-07-01 | 2026-10-04 |
| Portland General Electric | Schedule 201, Qualifying Facility 10 MW or Less Avoided Cost Power Purchase Information (Sheet Nos. 201-1 to 201-30) | 10 MW nameplate for all QF types, including solar and solar-plus-storage, since 2025-09-25 under HB 3863. Earlier, solar and solar+storage were capped at 3 MW. The cap aggregates same-motive-force facilities of the same owner within a five-mile radius. On-system QFs must take NRIS. Interim solar-plus-storage rates close after 50 MW aggregate, except for QFs of 100 kW or less. | Time-of-use by month and year. Tables give monthly On-Peak and Off-Peak $/MWh for each year from 2025 to 2050, by resource type, for non-renewable (Tables 1-4) and renewable (Tables 5-8) prices. On-Peak is 6:00 a.m. to 10:00 p.m. Monday-Saturday. Solar+storage is paid Premium Peak and Off-Peak prices. Wind and solar prices are net of integration costs (Table 9), which are added back for QFs outside PGE's Balancing Authority Area. As-Available QFs get 82.4% of the ICE Mid-C index. | 2025-06-25 | 2026-10-04 |
Rates, eligibility and contract terms change: confirm them with the utility or the state utility commission before relying on them.