PacifiCorp (Pacific Power): what it publishes for small generators (qualifying facilities) under PURPA, field by field, with the source for each. Checked on October 4, 2026.
When this may change: No date fixed. The May 1, 2026 annual update (OAR 860-029-0085(4)(a)) was waived by Order No. 26-149. Replacement rates under the new UM 2000 methodology (Order No. 26-021) were filed 2026-05-22 in Docket UM 2436 and are pending: Staff moved the item to the 2026-10-27 public meeting and recommends ordering supplemental filings within a week of that meeting. Rule baseline: May 1 annual update plus a post-IRP-acknowledgement update; ORS 758.525 requires a filing at least every two years.
Rates, eligibility and contract terms change: confirm them with the utility or the state utility commission before relying on them.
| Schedule | Oregon Standard Avoided Cost Rates – Avoided Cost Purchases From Eligible Qualifying Facilities (formerly Schedule 37)Source: pacificpower.net: Standard_Avoided_Cost_Rates_Avoided_Cost_Purcha… · also: edocs.puc.state.or.us: um1729haq336519026.pdf · checked 2026-10-04 | ||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Docket or order | OPUC Docket UM 1729(10). May 1, 2025 update approved by Order No. 25-226 (entered 2025-06-25). HB 3863 eligibility compliance filing of 2025-09-02. Order No. 26-149 waived the May 1, 2026 update.Source: apps.puc.state.or.us: 25-226.pdf · also: apps.puc.state.or.us: srchlist.asp?Prefix=UM&DocketNumber=1729&submit…, apps.puc.state.or.us: 26-149.pdf · checked 2026-10-04 | ||||||||||||||||||
| Effective date | 2025-07-01 Note: Price pages are effective 2025-07-01. Page 1 (applicability and size caps) is effective 2025-09-02 under HB 3863. Source: pacificpower.net: Standard_Avoided_Cost_Rates_Avoided_Cost_Purcha… · also: edocs.puc.state.or.us: um1729hau337627026.pdf · checked 2026-10-04 | ||||||||||||||||||
| Next update | No date fixed. The May 1, 2026 annual update (OAR 860-029-0085(4)(a)) was waived by Order No. 26-149. Replacement rates under the new UM 2000 methodology (Order No. 26-021) were filed 2026-05-22 in Docket UM 2436 and are pending: Staff moved the item to the 2026-10-27 public meeting and recommends ordering supplemental filings within a week of that meeting. Rule baseline: May 1 annual update plus a post-IRP-acknowledgement update; ORS 758.525 requires a filing at least every two years. Note: The new rates (6x6 block pricing, capacity ramp-in, RFP-based capacity values) will replace these legacy schedules when approved; the Staff report gives UM 2436 proposed 15-yr levelized prices that differ a lot from current ones. Source: edocs.puc.state.or.us: um2436hah349624029.pdf · also: edocs.puc.state.or.us: um1728hau345724110.pdf, edocs.puc.state.or.us: um2436hau349609029.pdf · checked 2026-10-04 | ||||||||||||||||||
| Size cap | 10,000 kW nameplate for Baseload, Solar, Solar and Storage, and Wind QFs since 2025-09-02. The size test aggregates same-owner, same-motive-force facilities at the same site (within 5 miles). On-system QFs must take NRIS. Interim Solar and Storage prices close at 50,000 kW cumulative, except for projects of 100 kW or less.Source: pacificpower.net: Standard_Avoided_Cost_Rates_Avoided_Cost_Purcha… · checked 2026-10-04 | ||||||||||||||||||
| Resource types | Base Load (any qualifying resource other than wind or solar), Wind, Fixed Solar, Tracking Solar, and Solar and Storage (interim rates). Standard Fixed prices are open to all QFs. Renewable Fixed prices are only for Renewable QFs, which must cede environmental attributes in the deficiency period.Source: pacificpower.net: Standard_Avoided_Cost_Rates_Avoided_Cost_Purcha… · checked 2026-10-04 | ||||||||||||||||||
| Energy rate structure | Annual On-Peak and Off-Peak energy prices in ¢/kWh by calendar year from 2025 to 2045, for each resource type, in Standard Fixed and Renewable Fixed tables. On-Peak is 6 a.m. to 10 p.m. PPT Monday-Saturday, excluding NERC holidays. Interim Solar and Storage gets monthly Premium Peak and Off-Peak prices. Wind and solar prices are net of integration charges, which are added back for QFs outside PacifiCorp's BAA. The Sufficiency Period ends 2026-12-31. Firm and non-firm market-index options are also offered.Source: pacificpower.net: Standard_Avoided_Cost_Rates_Avoided_Cost_Purcha… · checked 2026-10-04 | ||||||||||||||||||
| Energy rates (sample cells) |
Copied as printed: a few labelled cells, not the full rate matrix. The whole schedule is linked below. Note: Staff's June 2025 report gives 15-yr levelized (2026-2040) Standard Fixed prices of $57.75 (baseload), $58.44 (wind), $49.45 (fixed solar), $49.79 (tracking solar) and $74.20 (solar+storage) per MWh. Source: pacificpower.net: Standard_Avoided_Cost_Rates_Avoided_Cost_Purcha… · checked 2026-10-04 | ||||||||||||||||||
| Capacity payment | No separate capacity rate. The tariff publishes all-in On-Peak and Off-Peak energy prices, plus Premium Peak prices for solar+storage. Capacity value enters the prices from the Deficiency Period, which starts 2027-01-01. Note: The tariff pages read do not say in words how capacity is built into the prices. The 'from the deficiency period' point is inferred from the sufficiency/deficiency footnotes. Source: pacificpower.net: Standard_Avoided_Cost_Rates_Avoided_Cost_Purcha… · checked 2026-10-04 | ||||||||||||||||||
| Contract terms | Standard PPA of up to 20 years. Fixed prices are generally available for up to 15 years.Source: pacificpower.net: Standard_Avoided_Cost_Rates_Avoided_Cost_Purcha… · checked 2026-10-04 | ||||||||||||||||||
| Price fixity | Fixed when the contract is signed by both parties, for up to 15 years. Any remaining years of a contract of up to 20 years are paid the Firm Market Indexed Avoided Cost Price.Source: pacificpower.net: Standard_Avoided_Cost_Rates_Avoided_Cost_Purcha… · checked 2026-10-04 | ||||||||||||||||||
| Schedule link | https://www.pacificpower.net/content/dam/pcorp/documents/en/pacificpower/rates-regulation/oregon/tariffs/purpa/Standard_Avoided_Cost_Rates_Avoided_Cost_Purchases_From_Eligible_Qualifying_Facilities.pdfSource: pacificpower.net: Standard_Avoided_Cost_Rates_Avoided_Cost_Purcha… · checked 2026-10-04 |
Values are copied as printed in the source. Where a value draws on more than one document, every source is listed, primary first.