All utilities › Michigan
The standard-offer rates for small generators (qualifying facilities) published by 4 investor-owned utilities we cover in Michigan: Consumers Energy, DTE Electric, Indiana Michigan Power and Upper Peninsula Power (UPPCO). Checked on October 4, 2026.
| Utility | Schedule | Size cap | Rate structure | Effective | Checked on |
|---|---|---|---|---|---|
| Consumers Energy | Rule C18, Standard Offer - Purchased Power (M.P.S.C. No. 14 - Electric, Sheets C-74.00 to C-78.00) | QF design capacity 1 kWAC to 5 MWAC. QFs at or below 150 kWAC get the Full Avoided Cost Rate regardless of capacity need; QFs above 150 kWAC up to 5 MWAC get only the LMP-based energy options (Rate Option 1 or 2). | Full Avoided Cost Rate (<=150 kWAC): by-year table (2025-2056) of flat $/kWh energy rates by interconnection voltage (<46 kV vs 46 kV) plus a capacity rate in $/ZRC-Year. Rate Option 1 (As Available): actual MISO day-ahead LMP at CONS.CETR node x (1 + line loss factor) less $0.001/kWh admin fee, 15-year term. Rate Option 2 (LMP Energy Rate Forecast): 10-year term, years 1-5 at scheduled on-peak/off-peak forecast rates by year and voltage, years 6-10 at actual LMP. | 2026-01-30 | 2026-10-04 |
| DTE Electric | Standard Contract Rider No. 5 - Small Power Production and Cogeneration Facilities (M.P.S.C. No. 1 - Electric, Sheets D-78.00 to D-82.00) | Rider available to on-site small power production 5 MW and smaller or cogeneration 20 MW and smaller; the Standard Offer applies to QFs less than or equal to 550 kW (above 550 kW: negotiated agreement). | DTE currently states it has no capacity need, so the 'No Capacity Need' standard offer applies: energy paid at actual day-ahead MISO hourly LMP at the DTE load node for the life of the contract, OR a five-year fixed on-peak/off-peak annual LMP forecast table (by year) followed by actual day-ahead LMP for the rest of the term. A one mill/kWh administrative charge applies. | 2026-02-01 | 2026-10-04 |
| Indiana Michigan Power | Tariff COGEN/SPP (Cogeneration and/or Small Power Production Service), M.P.S.C. 19 - Electric, Sheets D-68.00 to D-74.00 | Standard Service customers with qualifying cogeneration facilities of 20 MW or less (COGEN) or small power production of 5 MW or less (SPP). Capacity and Energy Credit option limited to units capable of generating greater than 20 kW. | Energy-only Credit Option: fixed cents/kWh by year (Standard non-TOD, or TOD on-peak/off-peak) for the first 5 years of the contract, then real-time PJM LMP at an agreed node averaged monthly (or by on/off-peak). Capacity and Energy Credit Option: capacity $/kW-month plus real-time PJM LMP energy. | 2024-07-15 | 2026-10-04 |
| Upper Peninsula Power (UPPCO) | PG-4, D2. Parallel Generation - Purchase by UPPCO (MPSC Vol No 8-Electric, Sheets D-72.70 to D-72.73) | QFs with total customer-owned generating capacity of 550 kW AC or less (larger may negotiate); QFs 150 kW or less may alternatively use PG-2 (or PG-1M if 20 kW or less). | Rate Option 1 (As Available): actual MISO day-ahead LMP at UPPC.INTEGRATED node, loss-adjusted, less $0.001/kWh admin fee. Rate Option 2 (LMP Energy Rate Forecast): fixed on-peak/off-peak prices by year from tariff table for the first 5 years of contract term, then real-time MISO LMP averaged monthly. Distribution loss factors applied by voltage. | 2025-10-09 | 2026-10-04 |
Rates, eligibility and contract terms change: confirm them with the utility or the state utility commission before relying on them.