by Hundred Dollar Labs

All utilities › Idaho › Idaho Power

Idaho Power, Idaho: PURPA avoided-cost rates

Idaho Power Company: what it publishes for small generators (qualifying facilities) under PURPA, field by field, with the source for each. Checked on October 4, 2026.

When this may change: Annual SAR natural-gas update: per Orders 37109/37110/37111 future update cases are initiated within one month of EIA's Annual Energy Outlook publication, effective three months after publication (Avista/PacifiCorp orders say 'within three months'). Rates are also re-run when a utility's cost of capital changes in a general rate case.

Rates, eligibility and contract terms change: confirm them with the utility or the state utility commission before relying on them.

ScheduleSchedule 73, Cogeneration and Small Power Production Schedule - Idaho (I.P.U.C. No. 30, Tariff No. 101), paying IPUC-published SAR-based avoided cost rates for QFs at or below the Eligibility Cap

Note: Rate tables themselves are published by IPUC (Avoided Cost Rates page) rather than printed in Schedule 73.

Source: docs.idahopower.com: 306.pdf · checked 2026-10-04
Docket or orderIPUC Case No. IPC-E-26-13, Order No. 37109 (July 28, 2026), as corrected by Errata to Order No. 37109 (July 29, 2026)Source: puc.idaho.gov: 20260728Final_Order_No_37109.pdf · also: lf-puc.idaho.gov: ElectronicFile.aspx?docid=160026&dbid=0 · checked 2026-10-04
Effective date2026-07-28

Note: Order 37109 as issued said 'effective June 1, 2026'; the July 29, 2026 errata changed this to 'effective as of the date of this order' (order dated July 28, 2026).

Source: lf-puc.idaho.gov: ElectronicFile.aspx?docid=160026&dbid=0 · also: puc.idaho.gov: 20260728Final_Order_No_37109.pdf · checked 2026-10-04
Next updateAnnual SAR natural-gas update: per Orders 37109/37110/37111 future update cases are initiated within one month of EIA's Annual Energy Outlook publication, effective three months after publication (Avista/PacifiCorp orders say 'within three months'). Rates are also re-run when a utility's cost of capital changes in a general rate case.Source: puc.idaho.gov: 20260728Final_Order_No_37109.pdf · also: puc.idaho.gov: 20251212Final_Order_No_36871.pdf, puc.idaho.gov: 20260803Final_Order_No_37110.pdf, puc.idaho.gov: 20260803Final_Order_No_37111.pdf · checked 2026-10-04
Size capWind and solar: 100 kW nameplate; all other QFs: 10 average MW in any given month; energy storage: 100 kW or smaller. Larger QFs get IRP-based negotiated rates.Source: docs.idahopower.com: 306.pdf · also: puc.idaho.gov: Idaho Power Rates Order No. 37109 - New Contrac… · checked 2026-10-04
Resource typesPublished non-fueled tables for Wind, Solar, Non-seasonal hydro, Seasonal hydro, Other, plus Energy Storage (<=100 kW). Schedule 73 also provides fueled (fossil) levelized/non-levelized options with an adjustable fuel component, but no fueled table appears in the current IPUC new-contract rate PDF.Source: puc.idaho.gov: Idaho Power Rates Order No. 37109 - New Contrac… · checked 2026-10-04
Energy rate structureBy resource type, project online year and contract length; levelized or non-levelized. Heavy/Light Load Hour differential of $7.28/MWh (Daily Shape Adjustment); seasonal factors 73.5% (Mar-May), 120% (Jul, Aug, Nov, Dec), 100% (other months). Wind/solar subject to Schedule 87 integration charges (shown 'NA' in current tables). Rates are published by IPUC per online year (2026-2031) and contract length (1-20 years), levelized and non-levelized; the 'Rate Effective Date' line in the published PDFs is left as the placeholder 'XXXX XX, 2026'.Source: puc.idaho.gov: Idaho Power Rates Order No. 37109 - New Contrac… · also: docs.idahopower.com: 306.pdf · checked 2026-10-04
Energy rates (sample cells)
Cell (as labelled, with vintage)RateUnits
Solar, project on-line 2026, 20-year contract, levelized, Flat price (before seasonal factor)79.13$/MWh
Solar, project on-line 2026, 20-year contract, levelized, Heavy Load Hour (before seasonal factor)82.37$/MWh
Solar, project on-line 2026, 20-year contract, levelized, Light Load Hour (before seasonal factor)75.09$/MWh
Wind, project on-line 2026, 20-year contract, levelized, Flat price (before seasonal factor)50.87$/MWh
Other, project on-line 2026, 20-year contract, levelized, Flat price (before seasonal factor)68.94$/MWh

Copied as printed: a few labelled cells, not the full rate matrix. The whole schedule is linked below.

Note: Table columns carry no unit label; units taken from the SAR model workbook header 'LEVELIZED RATES ($/MWH)' (IPC-E-26-13 Attachment C) and Schedule 73's $7.28 per MWh daily shape.

Source: puc.idaho.gov: Idaho Power Rates Order No. 37109 - New Contrac… · also: lf-puc.idaho.gov: ElectronicFile.aspx?docid=158007&dbid=0, docs.idahopower.com: 306.pdf · checked 2026-10-04
Capacity paymentNone separate for generating QFs: published SAR rates cover energy and capacity. Energy storage QFs (<=100 kW) get a separate avoided cost of capacity for peak-hour generation, e.g. summer non-levelized 2027: 234.35 $/MWh; winter non-levelized 2027: 35.07 $/MWh.Source: puc.idaho.gov: Idaho Power Rates Order No. 37109 - New Contrac… · also: docs.idahopower.com: 306.pdf · checked 2026-10-04
Contract termsPublished rates tabulated for contract lengths of 1 to 20 years (full 20-year term available).Source: puc.idaho.gov: Idaho Power Rates Order No. 37109 - New Contrac… · also: lf-puc.idaho.gov: ElectronicFile.aspx?docid=158004&dbid=0 · checked 2026-10-04
Price fixityNon-fueled levelized and non-levelized rates are fixed for the contract term; fueled rates have a fixed component plus an adjustable (fuel) component changed periodically by Commission order.Source: docs.idahopower.com: 306.pdf · checked 2026-10-04
Schedule linkhttps://docs.idahopower.com/pdfs/aboutus/ratesregulatory/tariffs/306.pdf

Note: Current rate tables: https://puc.idaho.gov/Fileroom/PublicFiles/electric/Idaho%20Power%20Rates%20Order%20No.%2037109%20-%20New%20Contracts.pdf

Source: docs.idahopower.com: 306.pdf · checked 2026-10-04

Values are copied as printed in the source. Where a value draws on more than one document, every source is listed, primary first.

Also in Idaho: Avista, Rocky Mountain Power. All 59 utilities. Get every utility as CSV/JSON.