by Hundred Dollar Labs

All utilities › Idaho

Idaho PURPA avoided-cost rates

The standard-offer rates for small generators (qualifying facilities) published by 3 investor-owned utilities we cover in Idaho: Avista, Idaho Power and Rocky Mountain Power. Checked on October 4, 2026.

UtilityScheduleSize capRate structureEffectiveChecked on
AvistaSchedule 62, Cogeneration and Small Power Production Schedule - Idaho (I.P.U.C. No. 28), paying IPUC-published SAR-based avoided cost rates for QFs at or below the Eligibility CapWind and solar: 100 kW nameplate; all other QFs: 10 average MW in any given month. Larger QFs get IRP-based negotiated rates.By resource type, project online year and contract length; levelized or non-levelized. Heavy/Light Load Hour differential of $5/MWh (Daily Shape Adjustment); seasonal factors 108% (Jul-Feb) and 84% (Mar-Jun). Wind tables also show price less wind integration adjustment. Rates are published by IPUC per online year (2026-2031) and contract length (1-20 years), levelized and non-levelized; the 'Rate Effective Date' line in the published PDFs is left as the placeholder 'XXXX XX, 2026'.2026-08-032026-10-04
Idaho PowerSchedule 73, Cogeneration and Small Power Production Schedule - Idaho (I.P.U.C. No. 30, Tariff No. 101), paying IPUC-published SAR-based avoided cost rates for QFs at or below the Eligibility CapWind and solar: 100 kW nameplate; all other QFs: 10 average MW in any given month; energy storage: 100 kW or smaller. Larger QFs get IRP-based negotiated rates.By resource type, project online year and contract length; levelized or non-levelized. Heavy/Light Load Hour differential of $7.28/MWh (Daily Shape Adjustment); seasonal factors 73.5% (Mar-May), 120% (Jul, Aug, Nov, Dec), 100% (other months). Wind/solar subject to Schedule 87 integration charges (shown 'NA' in current tables). Rates are published by IPUC per online year (2026-2031) and contract length (1-20 years), levelized and non-levelized; the 'Rate Effective Date' line in the published PDFs is left as the placeholder 'XXXX XX, 2026'.2026-07-282026-10-04
Rocky Mountain PowerNo standard-offer rate schedule found in RMP's Idaho tariff; standard offer is the IPUC-published SAR avoided cost rates for PacifiCorp ('PacifiCorp Avoided Costs Rates For New Contracts', Order No. 37111). Electric Service Schedule No. 38, Qualifying Facility Avoided Cost Procedures, covers QFs above the published-rate caps.Wind and solar: 100 kW or smaller; non-wind/non-solar: smaller than 10 aMW. Above-cap QFs use Schedule 38 (IRP-based).By resource type, project online year and contract length; levelized or non-levelized flat price, shaped into Heavy/Light Load Hour prices for each month by monthly weighting factors (e.g. Jan HLH 103%/LLH 94%; Dec HLH 129%/LLH 120%). Wind/solar integration charges column shown 'NA'. Rates are published by IPUC per online year (2026-2031) and contract length (1-20 years), levelized and non-levelized; the 'Rate Effective Date' line in the published PDFs is left as the placeholder 'XXXX XX, 2026'.2026-08-032026-10-04

When these rates change next

Rates, eligibility and contract terms change: confirm them with the utility or the state utility commission before relying on them.