All utilities › Washington › Puget Sound Energy
Puget Sound Energy: what it publishes for small generators (qualifying facilities) under PURPA, field by field, with the source for each. Checked on October 4, 2026.
When this may change: Annual: each utility must file an updated schedule of estimated avoided costs by November 1 (WAC 480-106-040(1)). The 2025 filings took effect 2026-01-01, so the next filing is due by 2026-11-01, normally for 2027-01-01 rates.
Rates, eligibility and contract terms change: confirm them with the utility or the state utility commission before relying on them.
| Schedule | Schedule 91, Purchases from Qualifying Facilities of Five Megawatts or Less (Tariff WN U-60)Source: pse.com: elec_sch_091.pdf · checked 2026-10-04 | |||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Docket or order | WUTC Docket UE-250849 (Advice No. 2025-50, filed 2025-10-31), allowed to take effect on the 2025-12-11 No Action Agenda, with no separate order.Source: utc.wa.gov: 250849 · also: pse.com: elec_sch_091.pdf · checked 2026-10-04 | |||||||||||||||||||||
| Effective date | 2026-01-01Source: pse.com: elec_sch_091.pdf · checked 2026-10-04 | |||||||||||||||||||||
| Next update | Annual: each utility must file an updated schedule of estimated avoided costs by November 1 (WAC 480-106-040(1)). The 2025 filings took effect 2026-01-01, so the next filing is due by 2026-11-01, normally for 2027-01-01 rates. Note: The 2027-01-01 effective date is the past pattern, not a rule. Source: app.leg.wa.gov: default.aspx?cite=480-106-040 · checked 2026-10-04 | |||||||||||||||||||||
| Size cap | 5 MW nameplate or lessSource: pse.com: elec_sch_091.pdf · checked 2026-10-04 | |||||||||||||||||||||
| Resource types | Baseload RCW 80.80.040-compliant (designed for a capacity factor of at least 60%), Wind, Solar, and Baseload non-RCW 80.80.040-compliant (Attachment C, 5-year term). Rates differ for new QFs (Attachment A) and existing QFs (Attachment B), and for delivery to PSE's distribution or transmission system.Source: pse.com: elec_sch_091.pdf · checked 2026-10-04 | |||||||||||||||||||||
| Energy rate structure | Flat $/MWh fixed rates by year of delivery (2026-2041 tables), with no time-of-use split. Separate columns by resource and by delivery point (distribution or transmission). The rates combine energy and capacity. Section 4.D also gives current-year (2026) distribution-delivery rates, both combined and energy-only. Table No. 1 is an informational monthly Mid-C avoided energy forecast for 2026-2045, not a contract price.Source: pse.com: elec_sch_091.pdf · checked 2026-10-04 | |||||||||||||||||||||
| Energy rates (sample cells) |
Copied as printed: a few labelled cells, not the full rate matrix. The whole schedule is linked below. Source: pse.com: elec_sch_091.pdf · checked 2026-10-04 | |||||||||||||||||||||
| Capacity payment | Bundled into the fixed $/MWh rates. Informational Table No. 2 lists avoided capacity costs in nominal $/MWh for 2026: Baseload $15.49, Wind $5.44, Solar $2.48 (frame biodiesel peaker proxy, 2023 Progress Report). Section 4.D lists a 2026 energy-only rate of $45.26/MWh for all resources. When rates reflect the capacity cost of an eligible renewable resource, PSE receives the RECs at no added cost.Source: pse.com: elec_sch_091.pdf · checked 2026-10-04 | |||||||||||||||||||||
| Contract terms | New RCW 80.80.040-compliant QF: 15 years, and not less than 12 years from the commercial operation date. Existing compliant QF: 10 years. Baseload non-compliant QF: 5 years. Minimum PPA term: 1 year. Note: The tariff gives non-compliant baseload a 5-year term, but WAC 480-106-050(4)(a)(iii) says 'less than five years'. The tariff text is reported as printed. Source: pse.com: elec_sch_091.pdf · also: app.leg.wa.gov: default.aspx?cite=480-106-050 · checked 2026-10-04 | |||||||||||||||||||||
| Price fixity | Fixed for the whole PPA term. The rates in effect at full execution are attached to the PPA and are not amended during its term.Source: pse.com: elec_sch_091.pdf · checked 2026-10-04 | |||||||||||||||||||||
| Schedule link | https://www.pse.com/-/media/Project/PSE/Portal/Rate-documents/Electric/elec_sch_091.pdfSource: pse.com: elec_sch_091.pdf · checked 2026-10-04 |
Values are copied as printed in the source. Where a value draws on more than one document, every source is listed, primary first.