Avista Corporation (Avista Utilities): what it publishes for small generators (qualifying facilities) under PURPA, field by field, with the source for each. Checked on October 4, 2026.
When this may change: Annual: each utility must file an updated schedule of estimated avoided costs by November 1 (WAC 480-106-040(1)). The 2025 filings took effect 2026-01-01, so the next filing is due by 2026-11-01, normally for 2027-01-01 rates.
Rates, eligibility and contract terms change: confirm them with the utility or the state utility commission before relying on them.
| Schedule | Schedule 62, Small Power Production and Cogeneration Schedule (Qualifying Facilities – Washington), Tariff WN U-28Source: myavista.com: wa_062.pdf · also: apiproxy.utc.wa.gov: GetDocument?docID=5&year=2025&docketNumber=2508… · checked 2026-10-04 | |||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Docket or order | WUTC Docket UE-250845 (filed 2025-10-31), allowed to take effect on the 2025-12-11 No Action Agenda. The 2022 methodology was approved by Order 01 in UE-220786. A five-year waiver of WAC 480-106-040(1)(b) was granted in UE-230870.Source: utc.wa.gov: 250845 · also: apiproxy.utc.wa.gov: GetDocument?docID=5&year=2025&docketNumber=2508… · checked 2026-10-04 | |||||||||||||||
| Effective date | 2026-01-01 Note: Avista says the 2026 values are unchanged from the 2025 filing; only footnote 9 was added. Avista's website wa_062.pdf still shows the 2025-01-01 sheets. Source: utc.wa.gov: 250845 · also: apiproxy.utc.wa.gov: GetDocument?docID=5&year=2025&docketNumber=2508… · checked 2026-10-04 | |||||||||||||||
| Next update | Annual: each utility must file an updated schedule of estimated avoided costs by November 1 (WAC 480-106-040(1)). The 2025 filings took effect 2026-01-01, so the next filing is due by 2026-11-01, normally for 2027-01-01 rates. Note: The 2027-01-01 effective date is the past pattern, not a rule. Source: app.leg.wa.gov: default.aspx?cite=480-106-040 · checked 2026-10-04 | |||||||||||||||
| Size cap | 5 MW-AC nameplate or less for standard rates. Larger QFs get IRP-based rates. Note: From sheet 62 (effective 2023-01-01), which UE-250845 did not revise. Source: myavista.com: wa_062.pdf · checked 2026-10-04 | |||||||||||||||
| Resource types | Separate rate sheets for Wood Biomass, Geothermal, MT (Montana) Wind, On-System Wind, Solar + 4-hour battery, Solar, Summer Hydro and Hydro (sheets 62A-62H). Sheet 62J was also revised. Note: The rate sheets (62A-62J) are scanned images. Values were read visually from the 300-dpi page images saved as src/wa-avista/ue250845_trf_*_rotated.png. Quotes come from tesseract OCR (ue250845_trf_ocr_rotated.txt), so they keep OCR artifacts such as 'iNew'. The sheet-to-resource mapping comes from the OCR'd sheet titles; page 9 (62J) was not identified. Source: apiproxy.utc.wa.gov: GetDocument?docID=4&year=2025&docketNumber=2508… · checked 2026-10-04 | |||||||||||||||
| Energy rate structure | Time-of-delivery matrix. 'Non-Capacity Energy Values' are given by month, by HLH (6 a.m.-10 p.m. all days) or LLH, and by delivery year for 2026-2045, for each resource. A levelized capacity adder ($/MWh, all hours) is set by the first delivery year and paid on every MWh over the contract. Separate New (15-year) and Renew (10-year) rows. An 'Estimated 2026 Combined Average Annual Rate' is shown for illustration only. Standard rates include RECs, which pass to Avista. Short-term and as-available options pay the Powerdex hourly Mid-C index. Note: The rate sheets (62A-62J) are scanned images. Values were read visually from the 300-dpi page images saved as src/wa-avista/ue250845_trf_*_rotated.png. Quotes come from tesseract OCR (ue250845_trf_ocr_rotated.txt), so they keep OCR artifacts such as 'iNew'. Source: apiproxy.utc.wa.gov: GetDocument?docID=4&year=2025&docketNumber=2508… · checked 2026-10-04 | |||||||||||||||
| Energy rates (sample cells) |
Copied as printed: a few labelled cells, not the full rate matrix. The whole schedule is linked below. Note: The rate sheets (62A-62J) are scanned images. Values were read visually from the 300-dpi page images saved as src/wa-avista/ue250845_trf_*_rotated.png. Quotes come from tesseract OCR (ue250845_trf_ocr_rotated.txt), so they keep OCR artifacts such as 'iNew'. Source: apiproxy.utc.wa.gov: GetDocument?docID=4&year=2025&docketNumber=2508… · checked 2026-10-04 | |||||||||||||||
| Capacity payment | Levelized hourly capacity value ($/MWh, all hours), fixed by the first year of delivery and paid on all MWh for the full contract. Values are published only for first-delivery years 2026-2029 and are blank (zero) afterwards. Examples for 2026 first delivery: On-System Wind 2.50 (New) and 2.35 (Renew); Solar 2.13 (New) and 2.00 (Renew). Based on a levelized simple-cycle CT for 2025-2029, then IRP capacity cost. Unverified. We could not fully confirm this from a primary document; see the note. Check the source before using it. Note: The rate sheets (62A-62J) are scanned images. Values were read visually from the 300-dpi page images saved as src/wa-avista/ue250845_trf_*_rotated.png. Quotes come from tesseract OCR (ue250845_trf_ocr_rotated.txt), so they keep OCR artifacts such as 'iNew'. OCR garbled the capacity cells themselves (e.g. '2if 2isf'), so the numbers are machine-unverifiable but were read clearly from the image. Marked unverified at merge: the supporting quote cannot confirm the numbers because OCR garbled them, so they rest on a visual reading of a scan only. Source: apiproxy.utc.wa.gov: GetDocument?docID=4&year=2025&docketNumber=2508… · checked 2026-10-04 | |||||||||||||||
| Contract terms | New QFs: 15-year contract, with delivery starting within 3 years of execution. Renewals: 10-year term starting when the existing contract expires. Note: The rate sheets (62A-62J) are scanned images. Values were read visually from the 300-dpi page images saved as src/wa-avista/ue250845_trf_*_rotated.png. Quotes come from tesseract OCR (ue250845_trf_ocr_rotated.txt), so they keep OCR artifacts such as 'iNew'. Source: apiproxy.utc.wa.gov: GetDocument?docID=4&year=2025&docketNumber=2508… · checked 2026-10-04 | |||||||||||||||
| Price fixity | Specified-term standard rates are fixed at execution for the 15-year (new) or 10-year (renewal) term. Each delivery period pays the tabulated energy value for that period plus the capacity rate locked in for the year of first delivery.Source: apiproxy.utc.wa.gov: GetDocument?docID=4&year=2025&docketNumber=2508… · also: apiproxy.utc.wa.gov: GetDocument?docID=5&year=2025&docketNumber=2508… · checked 2026-10-04 | |||||||||||||||
| Schedule link | https://apiproxy.utc.wa.gov/cases/GetDocument?docID=4&year=2025&docketNumber=250845 Note: This is the WUTC copy of the 2026 Schedule 62 sheets. Avista's website copy (wa_062.pdf) was last revised for 2025-01-01. Source: apiproxy.utc.wa.gov: GetDocument?docID=4&year=2025&docketNumber=2508… · checked 2026-10-04 |
Values are copied as printed in the source. Where a value draws on more than one document, every source is listed, primary first.