All utilities › North Carolina
The standard-offer rates for small generators (qualifying facilities) published by 3 investor-owned utilities we cover in North Carolina: Dominion Energy North Carolina, Duke Energy Carolinas and Duke Energy Progress. Checked on October 4, 2026.
| Utility | Schedule | Size cap | Rate structure | Effective | Checked on |
|---|---|---|---|---|---|
| Dominion Energy North Carolina | Schedule 19-FP, Power Purchases from Cogeneration and Small Power Production Qualifying Facilities | Contracted Capacity no greater than 1,000 kW and no more than 1,000 kWh purchased at firm-delivery rates in any hour; Non-time-differentiated energy-only option limited to 100 kW or less | Energy is not a fixed tariff number: all energy payments are at the PJM Day-Ahead LMP for the node closest to the QF (hourly LMP for time-differentiated and Fixed Mode; monthly average of hourly DA LMP for non-time-differentiated <=100 kW), divided by 10 to get cents/kWh | 2026-10-02 | 2026-10-04 |
| Duke Energy Carolinas | Purchased Power Schedule PP (NC Seventeenth Revised Leaf No. 90, Electricity No. 4) | Contract Capacity of 1 MW or less (nameplate). Footnote: once 100 MW aggregate of post-Nov 16, 2016 LEO PPAs are executed, 'Monthly Rates' only available to sellers of 100 kW or less. | Time-of-use energy credits (cents/kWh) by season (Summer Jun-Sep, Winter Dec-Feb, Shoulder) with on-peak, premium-peak and off-peak periods; separate columns for Two-Year Fixed Rate vs Fixed Long-Term Rate (10 years), each for distribution- vs transmission-interconnected; separate rows for uncontrolled solar. Hourly As-Available Rates (marginal cost, computed monthly after the fact) also offered. | 2025-11-03 | 2026-10-04 |
| Duke Energy Progress | Purchased Power Schedule PP (NC Fourth Revised Leaf No. 590) | Contract Capacity of 1 MW or less (nameplate). Same 100 MW aggregate / 100 kW 'Monthly Rates' footnote as DEC. | Time-of-use energy credits (cents/kWh) by season with on-peak, premium-peak and off-peak periods; Two-Year Fixed vs Fixed Long-Term (10 years) columns, distribution vs transmission; separate uncontrolled-solar rows. Hourly As-Available Rates also offered. Payments for QFs of 10 kW or less only on a calendar-year basis. | 2025-11-03 | 2026-10-04 |
Rates, eligibility and contract terms change: confirm them with the utility or the state utility commission before relying on them.