All utilities › North Carolina › Duke Energy Carolinas
Duke Energy Carolinas, LLC: what it publishes for small generators (qualifying facilities) under PURPA, field by field, with the source for each. Checked on October 4, 2026.
When this may change: Company updates rates on November 1, 2027 (or as otherwise directed by NCUC) and every two years thereafter; G.S. 62-156(b) requires NCUC to set standard-contract avoided cost rates at least every two years
Rates, eligibility and contract terms change: confirm them with the utility or the state utility commission before relying on them.
| Schedule | Purchased Power Schedule PP (NC Seventeenth Revised Leaf No. 90, Electricity No. 4)Source: duke-energy.com: ncschedulepp.pdf · checked 2026-10-04 | |||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Docket or order | NCUC Docket No. E-100, Sub 211 (2025 biennial avoided cost proceeding); Order dated August 17, 2026Source: duke-energy.com: ncschedulepp.pdf · checked 2026-10-04 | |||||||||||||||||||||
| Effective date | 2025-11-03 Note: Sheet reads 'Effective for energy and capacity rendered on and after November 3, 2025' while citing the Sub 211 order dated 2026-08-17; i.e. approved rates apply back to the Nov 2025 filing date. Source: duke-energy.com: ncschedulepp.pdf · checked 2026-10-04 | |||||||||||||||||||||
| Next update | Company updates rates on November 1, 2027 (or as otherwise directed by NCUC) and every two years thereafter; G.S. 62-156(b) requires NCUC to set standard-contract avoided cost rates at least every two yearsSource: duke-energy.com: ncschedulepp.pdf · also: ncleg.gov: GS_62-156.html · checked 2026-10-04 | |||||||||||||||||||||
| Size cap | Contract Capacity of 1 MW or less (nameplate). Footnote: once 100 MW aggregate of post-Nov 16, 2016 LEO PPAs are executed, 'Monthly Rates' only available to sellers of 100 kW or less.Source: duke-energy.com: ncschedulepp.pdf · checked 2026-10-04 | |||||||||||||||||||||
| Resource types | Hydroelectric, trash or landfill-methane fueled, solar, wind, hog or poultry waste-fueled, or non-animal biomass-fueled QFs. Uncontrolled solar gets a separate (lower) energy credit row; controlled solar must use a negotiated PPA.Source: duke-energy.com: ncschedulepp.pdf · checked 2026-10-04 | |||||||||||||||||||||
| Energy rate structure | Time-of-use energy credits (cents/kWh) by season (Summer Jun-Sep, Winter Dec-Feb, Shoulder) with on-peak, premium-peak and off-peak periods; separate columns for Two-Year Fixed Rate vs Fixed Long-Term Rate (10 years), each for distribution- vs transmission-interconnected; separate rows for uncontrolled solar. Hourly As-Available Rates (marginal cost, computed monthly after the fact) also offered.Source: duke-energy.com: ncschedulepp.pdf · checked 2026-10-04 | |||||||||||||||||||||
| Energy rates (sample cells) |
Copied as printed: a few labelled cells, not the full rate matrix. The whole schedule is linked below. Source: duke-energy.com: ncschedulepp.pdf · checked 2026-10-04 | |||||||||||||||||||||
| Capacity payment | Separate capacity credit, Winter only (Dec-Feb), on-peak hours all Winter days 5:00-10:00 a.m.: 22.28 cents/kWh Fixed Long-Term (10 yr) distribution; 21.13 cents/kWh Two-Year Fixed distribution; 21.68 / 20.58 transmission. Same values printed for swine/poultry waste and certain hydro. No capacity credit on As-Available Rates.Source: duke-energy.com: ncschedulepp.pdf · checked 2026-10-04 | |||||||||||||||||||||
| Contract terms | Two-Year Fixed Rate (minimum two-year commitment for PPAs executed on/after Nov 1, 2025); Fixed Long-Term Rate (10 years); or As-Available (hourly) with no PPA term requirementSource: duke-energy.com: ncschedulepp.pdf · checked 2026-10-04 | |||||||||||||||||||||
| Price fixity | Fixed Long-Term rates fixed for the 10-year rate term (not affected by later updates); Two-Year Fixed Rates subject to change as of the initial filing date of each subsequent avoided cost proceeding; As-Available varies hourlySource: duke-energy.com: ncschedulepp.pdf · checked 2026-10-04 | |||||||||||||||||||||
| Schedule link | https://www.duke-energy.com/_/media/pdfs/for-your-home/rates/electric-nc/ncschedulepp.pdfSource: duke-energy.com: ncschedulepp.pdf · checked 2026-10-04 |
Values are copied as printed in the source. Where a value draws on more than one document, every source is listed, primary first.
Also in North Carolina: Dominion Energy North Carolina, Duke Energy Progress. All 59 utilities. Get every utility as CSV/JSON.