All utilities › North Carolina › Duke Energy Progress
Duke Energy Progress, LLC: what it publishes for small generators (qualifying facilities) under PURPA, field by field, with the source for each. Checked on October 4, 2026.
When this may change: Company updates rates on November 1, 2027 (or as otherwise directed by NCUC) and every two years thereafter; G.S. 62-156(b) biennial
Rates, eligibility and contract terms change: confirm them with the utility or the state utility commission before relying on them.
| Schedule | Purchased Power Schedule PP (NC Fourth Revised Leaf No. 590)Source: duke-energy.com: leaf-no-590-schedule-pp-ry-1.pdf · checked 2026-10-04 | ||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Docket or order | NCUC Docket No. E-100, Sub 211; Order dated August 17, 2026Source: duke-energy.com: leaf-no-590-schedule-pp-ry-1.pdf · checked 2026-10-04 | ||||||||||||||||||
| Effective date | 2025-11-03 Note: Sheet reads 'Effective for service rendered on and after November 3, 2025' while citing the Sub 211 order dated 2026-08-17. File name on duke-energy.com carries an 'ry-1' (rate year 1) suffix; content is the Sub 211 version. URL found via Wayback CDX listing because Duke's rates page is JS-rendered. Source: duke-energy.com: leaf-no-590-schedule-pp-ry-1.pdf · checked 2026-10-04 | ||||||||||||||||||
| Next update | Company updates rates on November 1, 2027 (or as otherwise directed by NCUC) and every two years thereafter; G.S. 62-156(b) biennialSource: duke-energy.com: leaf-no-590-schedule-pp-ry-1.pdf · also: ncleg.gov: GS_62-156.html · checked 2026-10-04 | ||||||||||||||||||
| Size cap | Contract Capacity of 1 MW or less (nameplate). Same 100 MW aggregate / 100 kW 'Monthly Rates' footnote as DEC.Source: duke-energy.com: leaf-no-590-schedule-pp-ry-1.pdf · checked 2026-10-04 | ||||||||||||||||||
| Resource types | Hydroelectric, trash or landfill-methane fueled, solar, wind, hog or poultry waste-fueled, or non-animal biomass-fueled QFs. Uncontrolled solar gets a separate (lower) energy credit row; controlled solar must use a negotiated PPA.Source: duke-energy.com: leaf-no-590-schedule-pp-ry-1.pdf · checked 2026-10-04 | ||||||||||||||||||
| Energy rate structure | Time-of-use energy credits (cents/kWh) by season with on-peak, premium-peak and off-peak periods; Two-Year Fixed vs Fixed Long-Term (10 years) columns, distribution vs transmission; separate uncontrolled-solar rows. Hourly As-Available Rates also offered. Payments for QFs of 10 kW or less only on a calendar-year basis.Source: duke-energy.com: leaf-no-590-schedule-pp-ry-1.pdf · checked 2026-10-04 | ||||||||||||||||||
| Energy rates (sample cells) |
Copied as printed: a few labelled cells, not the full rate matrix. The whole schedule is linked below. Source: duke-energy.com: leaf-no-590-schedule-pp-ry-1.pdf · checked 2026-10-04 | ||||||||||||||||||
| Capacity payment | Separate capacity credit, Winter only (Dec-Feb), on-peak hours all Winter days 4:00-9:00 a.m.: 20.94 cents/kWh Fixed Long-Term (10 yr) distribution; 19.74 Two-Year Fixed distribution; 20.62 / 19.44 transmission. Same values printed for swine/poultry waste and certain hydro.Source: duke-energy.com: leaf-no-590-schedule-pp-ry-1.pdf · checked 2026-10-04 | ||||||||||||||||||
| Contract terms | Two-Year Fixed Rate (minimum two-year commitment); Fixed Long-Term Rate (10 years); or As-Available hourlySource: duke-energy.com: leaf-no-590-schedule-pp-ry-1.pdf · checked 2026-10-04 | ||||||||||||||||||
| Price fixity | Fixed Long-Term rates fixed for the 10-year rate term; Two-Year Fixed Rates subject to change as of the initial filing in each later avoided cost proceeding; As-Available varies hourlySource: duke-energy.com: leaf-no-590-schedule-pp-ry-1.pdf · checked 2026-10-04 | ||||||||||||||||||
| Schedule link | https://www.duke-energy.com/-/media/pdfs/for-your-home/rates/dep-nc/leaf-no-590-schedule-pp-ry-1.pdfSource: duke-energy.com: leaf-no-590-schedule-pp-ry-1.pdf · checked 2026-10-04 |
Values are copied as printed in the source. Where a value draws on more than one document, every source is listed, primary first.
Also in North Carolina: Dominion Energy North Carolina, Duke Energy Carolinas. All 59 utilities. Get every utility as CSV/JSON.