All utilities › Montana
The standard-offer rates for small generators (qualifying facilities) published by 2 investor-owned utilities we cover in Montana: Montana-Dakota Utilities and NorthWestern Energy. Checked on October 4, 2026.
| Utility | Schedule | Size cap | Rate structure | Effective | Checked on |
|---|---|---|---|---|---|
| Montana-Dakota Utilities | Rate 93, Power Purchase Time Differentiated (Montana Electric Rate Schedule Volume No. 5, Sheet Nos. 45-45.2), with optional Rate 94 Net Billing Option (Sheet Nos. 46-46.1) | QFs with nameplate capacity of 3 MW or less | Variable hourly market index: actual MISO real-time energy price for Montana-Dakota's load in MISO at the time of delivery, determined hourly. Net Billing Option (Rate 94): net monthly purchases are paid a flat Avoided Cost Energy Payment Rate. Metering charges of $17.55/month (single phase) and $22.45/month (three phase) apply. | 2026-06-01 | 2026-10-04 |
| NorthWestern Energy | Schedule No. QF-1, Qualifying Facility Power Purchase (Electric Tariff Sheet Nos. 74.1-74.5) | 3 MW nameplate or less for standard QF-1 rates. QFs over 3 MW get a negotiated rate not to exceed avoided cost. | Real-time market index, no fixed number. For QFs in NorthWestern's Balancing Authority Area: the CAISO fifteen-minute-market LMP at the assigned pricing node. For QFs outside the BAA: the CAISO fifteen-minute-market price at the DGAP for NorthWestern's BAA. Payment = actual average generation in each 15-minute interval times the energy rate, paid monthly. Ancillary-service costs (OATT, net of a non-variable resource) are deducted from payments. | 2025-07-22 | 2026-10-04 |
Rates, eligibility and contract terms change: confirm them with the utility or the state utility commission before relying on them.