NorthWestern Energy (NorthWestern Corporation d/b/a NorthWestern Energy, Montana): what it publishes for small generators (qualifying facilities) under PURPA, field by field, with the source for each. Checked on October 4, 2026.
When this may change: Not stated in the source. unverified
Rates, eligibility and contract terms change: confirm them with the utility or the state utility commission before relying on them.
| Schedule | Schedule No. QF-1, Qualifying Facility Power Purchase (Electric Tariff Sheet Nos. 74.1-74.5) Note: The tariff PDF is a scanned image. The text file is tesseract OCR, and the numbers were checked visually against the page image. Source: northwesternenergy.com: qf-1.pdf · checked 2026-10-04 | ||||||
|---|---|---|---|---|---|---|---|
| Docket or order | MPSC Docket No. 2023.08.076; Final Order No. 7923m (Order Served May 27, 2025; tariff Staff Approved July 22, 2025) Note: The tariff PDF is a scanned image. The text file is tesseract OCR, and the numbers were checked visually against the page image. A July 2025 PSC docket-status report says NorthWestern and QF intervenors moved for reconsideration in June 2025. The tariff footer cites Order 7923m, but the order text itself was not obtained. Source: northwesternenergy.com: qf-1.pdf · also: archive.legmt.gov: PSC_Status_of_Dockets7-2025.pdf · checked 2026-10-04 | ||||||
| Effective date | 2025-07-22 Note: The footer reads 'Effective for services rendered on or after July 22, 2025' (12th Revised Sheet 74.1). NorthWestern's tariff index page still labels QF-1 'February 2021', but the PDF it links is the July 2025 revision. No later revision was found. Source: northwesternenergy.com: qf-1.pdf · checked 2026-10-04 | ||||||
| Next update | Not stated in the source. Unverified. We could not fully confirm this from a primary document; see the note. Check the source before using it. Note: Neither the tariff nor NorthWestern's QF page states an update schedule. A secondary reproduction of ARM 38.5.1902 (Cornell LII, not saved as primary) says the utility recomputes avoided costs for standard rates after submitting its resource plan. NorthWestern published a 2026 Montana IRP, but no follow-on QF-1 filing was confirmed. Source: northwesternenergy.com: qualifying-facilities · checked 2026-10-04 | ||||||
| Size cap | 3 MW nameplate or less for standard QF-1 rates. QFs over 3 MW get a negotiated rate not to exceed avoided cost.Source: northwesternenergy.com: qf-1.pdf · also: northwesternenergy.com: qualifying-facilities · checked 2026-10-04 | ||||||
| Resource types | Any QF under Commission rules. Capacity rates differ by resource: wind, solar, and hydro/other ('Other QF' means QFs other than hydro, wind or solar, e.g. cogeneration and biomass). Note: The tariff PDF is a scanned image. The text file is tesseract OCR, and the numbers were checked visually against the page image. Source: northwesternenergy.com: qf-1.pdf · checked 2026-10-04 | ||||||
| Energy rate structure | Real-time market index, no fixed number. For QFs in NorthWestern's Balancing Authority Area: the CAISO fifteen-minute-market LMP at the assigned pricing node. For QFs outside the BAA: the CAISO fifteen-minute-market price at the DGAP for NorthWestern's BAA. Payment = actual average generation in each 15-minute interval times the energy rate, paid monthly. Ancillary-service costs (OATT, net of a non-variable resource) are deducted from payments. Note: The tariff PDF is a scanned image. The text file is tesseract OCR, and the numbers were checked visually against the page image. Source: northwesternenergy.com: qf-1.pdf · checked 2026-10-04 | ||||||
| Energy rates (sample cells) |
Copied as printed: a few labelled cells, not the full rate matrix. The whole schedule is linked below. Note: The tariff PDF is a scanned image. The text file is tesseract OCR, and the numbers were checked visually against the page image. The tariff prints no fixed numeric energy rate. Source: northwesternenergy.com: qf-1.pdf · checked 2026-10-04 | ||||||
| Capacity payment | Paid monthly as the resource-specific capacity rate times nameplate capacity: Wind $4.37/kW(NP)-month; Solar $2.85/kW(NP)-month; Hydro/Other $11.20/kW(NP)-month (NP = nameplate). Note: The tariff PDF is a scanned image. The text file is tesseract OCR, and the numbers were checked visually against the page image. Source: northwesternenergy.com: qf-1.pdf · checked 2026-10-04 | ||||||
| Contract terms | Not less than one month and not more than 20 years Note: The tariff PDF is a scanned image. The text file is tesseract OCR, and the numbers were checked visually against the page image. Source: northwesternenergy.com: qf-1.pdf · checked 2026-10-04 | ||||||
| Price fixity | Energy is variable, set by 15-minute CAISO market prices. The tariff does not say whether the capacity rate is fixed for the contract term. A PSC docket-status report says NorthWestern proposed capacity rates 'fixed for the duration of the contract' and that the final order 'generally approved NorthWestern's proposed contract terms'. Unverified. We could not fully confirm this from a primary document; see the note. Check the source before using it. Note: Capacity fixity is unconfirmed because the final order and standard PPA were not obtained. Source: archive.legmt.gov: PSC_Status_of_Dockets7-2025.pdf · checked 2026-10-04 | ||||||
| Schedule link | https://northwesternenergy.com/docs/default-source/default-document-library/billing-and-payment/rates-and-tariffs/montana/rates/qf-1.pdfSource: northwesternenergy.com: qualifying-facilities · checked 2026-10-04 |
Values are copied as printed in the source. Where a value draws on more than one document, every source is listed, primary first.
Also in Montana: Montana-Dakota Utilities. All 59 utilities. Get every utility as CSV/JSON.