by Hundred Dollar Labs

All utilities › Georgia

Georgia PURPA avoided-cost rates

The standard-offer rates for small generators (qualifying facilities) published by the investor-owned utility we cover in Georgia: Georgia Power. Checked on October 4, 2026.

UtilityScheduleSize capRate structureEffectiveChecked on
Georgia PowerQF Standard Offer Contracts approved by the GPSC: Energy-Only PPA ('Standard Contract for the Purchase of Non-Firm Energy from a Qualifying Facility', available to any eligible QF); Capacity and Energy PPA and Proxy PPA (only when Georgia Power has an IRP capacity need and has issued a capacity RFP). Small customer-sited generation sells excess energy under tariff Schedule RNR-11 (Renewable and Nonrenewable Resources).Energy-Only PPA: any eligible QF (small power production QFs are 80 MW or less under FERC rules). Capacity payment: a QF over 30 MW must bid into a capacity RFP; a QF of 30 MW or less is exempt from bidding but must give notice of intent through the RFP. RNR-11: renewable resources up to 10 kW AC (residential) or 250 kW AC (commercial), with 100-250 kW AC systems limited to 125% of the prior year's peak demand; fuel cells up to 10 kW AC (residential) or 100 kW AC (commercial).As-available, variable hourly pricing. Energy-Only PPA monthly payment = the sum over each hour of energy delivered (grossed up for RCB Framework loss benefits, roughly 0-7% depending on interconnection level) times the Hourly Avoided Energy Rate ($/MWh) for that hour. The annual filing gives informational 20-year projections: for non-intermittent QFs by year and by season/period (peak season June-September; peak hours are weekday 9am-10pm EDT); for intermittent QFs by year and technology (profile-weighted). The QF also pays a Monthly Administrative Charge of $115 (<3 MW) or $275 (>=3 MW). RNR-11 Instantaneous Netting credits excess energy at the annual Solar Avoided Energy Cost rate plus a 4 cents/kWh Renewable Generation Adder.No single effective date: energy is paid at the hourly avoided cost under the pro forma contracts approved by the 2021-03-11 Final Order; the current avoided-cost projections were filed 2026-06-262026-10-04

When these rates change next

Rates, eligibility and contract terms change: confirm them with the utility or the state utility commission before relying on them.