Dominion Energy Virginia: PURPA avoided-cost rates

Virginia Electric and Power Company: what it publishes for small generators (qualifying facilities) under PURPA, field by field, with the source for each. Checked on October 4, 2026.

When this may change: No fixed refiling cycle stated. The tariff says its provisions and rates are 'subject to modification at any time in the manner prescribed by law'; energy and capacity prices are indexed to PJM and change with the market.

Rates, eligibility and contract terms change: confirm them with the utility or the state utility commission before relying on them.

ScheduleSchedule 19, Power Purchases from Cogeneration and Small Power Production Qualifying FacilitiesSource: cdn-dominionenergy-prd-001.azureedge.net: schedule-19.pdf · also: cdn-dominionenergy-prd-001.azureedge.net: entire-filed-tariff.pdf · checked 2026-10-04
Docket or orderSchedule 19 revised (small power producer cap cut from 20,000 kW to 5,000 kW after FERC Order No. 872) in SCC Case No. PUR-2021-00220 (Final Order December 9, 2021; effective for usage on and after September 15, 2021). Current sheets (filed 12-20-22, effective 01-01-24) were accepted for filing by SCC Staff on June 27, 2023 in the 2021 triennial review, Case No. PUR-2021-00058 (Final Order November 18, 2021). The avoided cost methodology itself dates to Case No. PUE-2008-00078 (Final Order May 18, 2010).

Note: The tariff sheet itself prints no case number; case numbers come from the SCC Staff acceptance letters and the PUR-2021-00220 application. Not confirmed in which case the PJM LMP-based energy pricing was first adopted.

Source: scc.virginia.gov: 364331 · also: scc.virginia.gov: 364332, scc.virginia.gov: 294590, scc.virginia.gov: 262602, cdn-dominionenergy-prd-001.azureedge.net: schedule-19.pdf · checked 2026-10-04
Effective date2024-01-01

Note: Sheets read 'Filed 12-20-22 ... This Filing Effective For Usage On and After 01-01-24'. The Dominion entire filed tariff table of contents (filing dated 12-09-25, effective 01-01-26) still lists Schedule 19 at 01-01-24, so no later revision was found.

Source: cdn-dominionenergy-prd-001.azureedge.net: schedule-19.pdf · also: cdn-dominionenergy-prd-001.azureedge.net: entire-filed-tariff.pdf · checked 2026-10-04
Next updateNo fixed refiling cycle stated. The tariff says its provisions and rates are 'subject to modification at any time in the manner prescribed by law'; energy and capacity prices are indexed to PJM and change with the market.

Note: No Virginia rule requiring periodic avoided-cost refilings was found; Schedule 19 has been changed through specific SCC cases and Dominion's base-rate reviews.

Source: cdn-dominionenergy-prd-001.azureedge.net: schedule-19.pdf · checked 2026-10-04
Size capCogenerators with net capacity of 20,000 kW or less; small power producers with net capacity of 5,000 kW or less. Energy-only option only for QFs of 10 kW or less. Developers may not site Schedule 19 facilities within one-half mile of each other unless an exception applies (e.g. renewable resources with siting limits). Available to QFs reaching commercial operation on or after September 15, 2021.

Note: The 5,000 kW small power cap follows FERC's June 16, 2021 letter order ending Dominion's purchase obligation for small power QFs above 5 MW in PJM (Case PUR-2021-00220 application).

Source: cdn-dominionenergy-prd-001.azureedge.net: schedule-19.pdf · also: scc.virginia.gov: 262602 · checked 2026-10-04
Resource typesAny PURPA cogenerator or small power producer QF; no separate prices by resource type. Renewable resources with geographic siting limits (hydro, solar, wind) are exempt from the one-half mile separation rule.Source: cdn-dominionenergy-prd-001.azureedge.net: schedule-19.pdf · checked 2026-10-04
Energy rate structureMarket-indexed. Energy-and-capacity QFs: hourly price in cents per kWh equal to the hourly PJM Dom Zone day-ahead LMP ($/MWh) divided by 10, times hourly net generation. Energy-only QFs (10 kW or less): monthly average of the hourly Dom Zone DA LMP divided by 10. All energy prices increased by 2.8% for avoided line losses (or a site-specific study at the QF's cost), fixed for the contract term. Monthly meter reading and processing charge billed to the QF: $6.56 (one non-time differentiated meter), $76.73 (one time differentiated meter), $120.96 (two time differentiated meters).Source: cdn-dominionenergy-prd-001.azureedge.net: schedule-19.pdf · checked 2026-10-04
Energy rates (sample cells)
Cell (as labelled, with vintage)RateUnits
Energy-and-capacity QFs (all QFs over 10 kW; optional for 10 kW or less): hourly PJM Dom Zone day-ahead LMP divided by 10, plus 2.8% line loss adder (market-indexed; no fixed number printed)variable (PJM Dom Zone day-ahead LMP, hourly)cents/kWh
Energy-only QFs (10 kW or less): monthly average of hourly PJM Dom Zone day-ahead LMP divided by 10, plus 2.8% line loss adder (market-indexed; no fixed number printed)variable (PJM Dom Zone day-ahead LMP, monthly average)cents/kWh

Copied as printed: a few labelled cells, not the full rate matrix. The whole schedule is linked below.

Note: The tariff converts the $/MWh LMP to cents per kWh by dividing by 10; no numeric energy price is printed.

Source: cdn-dominionenergy-prd-001.azureedge.net: schedule-19.pdf · checked 2026-10-04
Capacity paymentEnergy-and-capacity QFs only: daily on-peak capacity price (cents per kWh) = PJM RPM Base Residual Auction clearing price for the Dom Zone ($/MW-day) divided by 16 hours and by 10, applied to the QF's daily net on-peak generation (on-peak 7 AM to 11 PM every day). Monthly payment is multiplied by a Summer Peak Performance Factor (0 to 1) = number of the 5 PJM summer coincident peak hours in which the QF produced at least 75% of its net capacity, divided by 5. Energy-only QFs get no capacity payment.Source: cdn-dominionenergy-prd-001.azureedge.net: schedule-19.pdf · checked 2026-10-04
Contract termsWritten Agreement with the Company; term mutually agreed, not less than one year. QF pays interconnection costs (lump sum or monthly charge) and removal costs; the Company may curtail during minimum load conditions up to 1,000 off-peak hours per calendar year.Source: cdn-dominionenergy-prd-001.azureedge.net: schedule-19.pdf · checked 2026-10-04
Price fixityVariable: energy and capacity prices follow PJM day-ahead LMP and RPM capacity prices. Only the 2.8% line loss percentage is fixed for the contract term. The tariff says payments to QFs with fixed-term contracts at payments set when the obligation is incurred stay at their contract levels.Source: cdn-dominionenergy-prd-001.azureedge.net: schedule-19.pdf · checked 2026-10-04
Schedule linkhttps://cdn-dominionenergy-prd-001.azureedge.net/-/media/content/rates-and-tariffs/pdfs/virginia/large-business/schedule-19.pdfSource: cdn-dominionenergy-prd-001.azureedge.net: schedule-19.pdf · also: cdn-dominionenergy-prd-001.azureedge.net: entire-filed-tariff.pdf · checked 2026-10-04

Values are copied as printed in the source. Where a value draws on more than one document, every source is listed, primary first.

Also in Virginia: Appalachian Power. All 59 utilities. Get every utility as CSV/JSON.